The completion acceptance of decoration literacy

After months of arduous renovation, we finally expected this day of acceptance. Completion acceptance is the final step in the renovation process and represents that the hard-packed part of the interior decoration company has been completed. So what do we need to pay attention to when completing the acceptance of the decoration? What are the points of attention for completion acceptance? Who needs to be on the court? What is a process? Let's take a look together.

First, the meaning of acceptance

After months of arduous renovation, we finally expected this day of acceptance. Completion acceptance is the final step in the renovation process and represents that the hard-packed part of the interior decoration company has been completed. So what do we need to pay attention to when completing the acceptance of the decoration? What are the points of attention for completion acceptance? Who needs to be on the court? What is a process? Let's take a look together.

  

Second, the completion of the acceptance process 1, after the renovation of the construction, the decoration person and decoration company responsible person to the management office to submit an application for acceptance.

2. The management office organized inspection and acceptance personnel (electrical and mechanical maintenance team supervisors and technical personnel, public affairs team managers and administrators) to conduct site acceptance of the decoration within the same day. If there is no violation of the regulations, the decoration shall be handled according to the following procedures: If any violation is found, follow the rules for handling the violation.

3. If the acceptance of the project is satisfactory, the head of the Public Affairs Section of the Management Office shall sign the “Qualified Qualification” in the “Completion Acceptance” section of the “Renovation Application Form” and sign the name and date.

4. The security team of the management office shall retake the construction permit. If there is any loss, the decoration company shall give certain compensation.

5. The decoration company left the clearance site on the same day.

6. After one month of renovation and acceptance, the Public Affairs Section of the Management Office shall re-inspect the decoration construction organization. The re-inspection will be no problem. After being instructed in the “Renovation Application Form” by the head of the Public Affairs Section, The director of the management office was sent for approval. The financial department returned the decoration deposit for the decoration person and decoration company.

7. In the renovation and construction acceptance, if the decoration person has violated the rules of decoration, the head of the public affairs department shall make a valuation according to the regulations and list the deduction amount. After the director of the management office agrees, the deduction of the list will be made to the decoration person. The financial group is handed over to the financial group and deducted by the following method:

1, first deduct the money from the renovation company's decoration deposit;

2. The renovation company's decoration deposit is not enough to compensate for the deduction, and will be deducted from the decoration person's decoration deposit;

3, deduct the decoration of the decoration of the deposit still can not compensate for the deductions, require repair people to pay compensation;

4. The decoration information is archived and stored for a long time.

  

III. Precautions for completion acceptance

1, the door and window are firmly installed

The installation of doors and windows must be firm, horizontal and vertical, the same height, doors and windows should be open and flexible, no block and rebound phenomenon. Hardware accessories are complete. The door lock installation position is correct, the switch is flexible and effective. After the installation of windows and doors, the surface should be clean, with no scratches or bumps on the large surface. The large surface of the film should be smooth, uniform in thickness, and free from porosity. Fine wood products, such as curtain boxes, heating covers, wood retaining walls, wooden partitions, door and window covers, skirting boards, and decorative lines, must be firmly studded with the base layer without looseness. The lining board and the panel must be firmly bonded and no layering or drumming may occur. The paint should be smooth, smooth, and uniform in color.

2, water pipe installation qualified

Bathroom hot and cold water switches, faucets, showers, etc. are installed in a flat, flexible and convenient use, and can be turned on and off several times during inspection to see if the water flow changes with the size of the water festival door opening. Drainage pipelines should be open, no backslope, no clogging, no leakage, floor drains should be slightly lower than the ground. During the acceptance, the water should be drained repeatedly and discharged to see if the drainage is unobstructed.

3, brick flat and firm

Tiles should be flat and firm, uniform joints, and local emptying should not exceed 5% of the total. The floor of the kitchen and toilet, which is in contact with the wall around the floor waterproofing layer, should be turned upwards and not less than 250 mm above the ground. The surface water layer of the ground surface drains to the floor drain, and the pan water or water is not poured. The 24-hour storage test has no leakage.

4, wall finish construction

The wall top finishing project requires that the putty should be solid and firm with the substrate, and it must not be skin, powder or crack. Latex paint is strictly prohibited peeling, brushing, bottoming, no surface flow, wrinkled skin, the same surface color, no obvious brush marks.

5, keel fixation

Hanging mirror line, vertex angle line and other wood decoration line docking, should use 45 degrees plus glue slope, joints shall not have the wrong seam, from the joint phenomenon. It is required to be straight and even, close to the wall, and close to the correct circle. The ceiling keel must not be twisted or deformed, and the installed keel should be solid and reliable. The surface of the gypsum plaster board is tightly connected with the keel. The galvanized bolt is used to fix it on the keel. The nail head should be brushed with antirust paint.

6, electrical engineering inspection

After the completion of the electrical engineering construction, necessary inspections and tests shall be carried out, such as lighting test and switch test control, and repeated switching several times. Check whether the line meets the requirements of "Fire line into the switch, zero line into the lamp", the outlet should meet the "left zero right fire, grounding in the" provisions. The switch socket panel shall be securely installed, in the correct position, with a correct cover, a smooth surface, and close to the wall with no gaps around. The height of the switch or socket in the same room should be the same. When the project is completed, it is required to ask the construction unit for a schematic drawing of the wiring, indicating the wire size and the direction of the pipe.

  

Fourth, the main concern of this industry

1. Construction leader acceptance

Acceptance by the construction team leader. After the acceptance, it will start work on the market. All construction workers must evacuate the site in time.

2. Three-party acceptance

The formal acceptance of the three party appointments. The construction team informed the owner. Property company. Approved official acceptance. After the acceptance of the two parties through the decoration project officially delivered to the owners.

3. Total settlement

In the general settlement, the owner pays the decoration company or the construction team all costs. The other party opened its hair to the owner. At the same time, the property company is required to return the deposit to the owner's decoration and acceptance notice.

4. Renovation Warranty Card <br> Renovation company into a decoration team to the owner of the decoration project credit guarantee card. The owner should save the animal, so that if there is a problem in the housing during the future can contact maintenance.

The acceptance of decoration is very important, and it is related to the safety and quality of life in the future. Every detail cannot be missed. It must be passed in accordance with the standards. Also want to know more decoration knowledge, please pay attention to this website decoration information channel.

Decoration process completion stage

Active Ingredient:     Quaternary ammonium salt cationic surfactant 
Chemical Name:       Formaldehyde-free Fixing Agent  
Chemical Family:     PolyDADMAC

CAS No.:                   26062-79-3  


1.Formaldehyde-free Fixing Agent 

2.Has no free formaldehyde,no peculiar smell,no irritation to skin, accord to eco request  

 

[Description]:

        Formaldehyde-free Fixative Color Fixing Agent is belongs to polymerization polyDADMAC, a cationic polymer. It can make up of macromolecular compound with dye, then achieve to improve soaping and rub fastness of fabrics. It can be used for color fixing for dyeing and printing of reactive dyed fabrics as cotton, linen, silk, and direct dyed fabrics.

 

[Specification]:

              Appearance:  Brownish yellow viscous liquid

              Ionic character:  Cationic

              PH Value:  5-8 (1% aqueous solution)

              Dissolution:  Dissolve in cold water easily.

              Composition: Special polymer compound

 

[Dilution Method]:

With 4-6 times the water and stir to dissolve dilution.

 

[Direction for Usage]:(To dilute finished product as an example)

A. Padding Process: 5-20g/L, temperature 40°C-60°C, PH Value:5-8, One-dip-one-nip or Double-dip-double-nip.

B. Dipping process: 1-4% (O.W.F), Room temperature 40°C-60°C, PH Value:5-8, bath ratio:1:8-12,Time: 20-30 min.



[Properties]:

1. Concentrated Formaldehyde-free Fixative Fixing Agent has good color fixing property, can obviously improve the dyeing or printing of fabric soaping, washing fastness and wet rubbing fastness.

2. Can be used for much of the association between dye fixation, anti fading property, does not affect the dyeing or printing of fabric vividness. No effect for the original feel, processing fabric has excellent hydrophilic.

3. Formaldehyde-free Fixative  widely used for dyeing or printing of the direct, active dye fixing finishing, good fixation effect, especially for the red dye and Cuilan dyes, particularly prominent, fixation is better than the general Formaldehyde-free Fixative.

4. The dye PH value for a wide range, acid, alkali resistance, resistance to hard water, high temperature resistance, an environment-friendly products, does not contain formaldehyde.

Specifications:

Appearance: Colorless, Transparent Colloid
Viscosity: 100cps-80000cps
Solid Content: 40%min.
PH (30% solution):

3 - 7

Ionic Nature:

Cationic

Specific Gravity: About 1.1

  

Packaging & Shipping

  

Package and Storage:

  1. It is harmless, no-flammable and non-explosive, it can be stored at room temperature, it can not be placed in the sun.
  2. It is packaged in plastic drums with each containing 25kg, 210kg, 1100kg , or others according to the requirements of clients.
  3. Storage temperature: 5-30°C.
  4. The product would show slightly stratification or appear white at low temperature. There is no negative impact on the performance after mixing up.

Dye Fix Agent

Textile Chemicals

Textile Chemicals,Decolorizing Agent,Textile Fixing Agent,Dye-Fixing Agent For Textile

Shandong Tiancheng Chemical Co., Ltd. , https://www.akdchemical.nl