1, inventory items
The user and the decoration company jointly check the items listed on the decoration project contract and the project modification visa list item by item to see if the contents of the listed items are all completed. Items that are not completely completed will not be accepted. Major renovation projects, such as wall surfaces, floors, doors and windows, etc., which have not been completed completely, shall be postponed for completion acceptance.
2, check the quality of decoration
First check the material type, specifications, etc., then carefully examine the appearance quality, and then use the inspection tool to measure the deviation value. According to the quality standard of the corresponding decoration project, it is determined whether the project meets the requirements and the qualified person can check it. The types and specifications of materials used in each project must meet the design requirements. Those who do not meet the design requirements must rework and rework. If the quality of the appearance does not meet the quality standards, both parties may negotiate repairs or partial rework. In the inspection, the number of inspection points exceeding the specified deviation value shall not exceed 30% of the total inspection points. It shall be judged as qualified and acceptable; if it exceeds 30%, the project shall be judged as unqualified, and shall be repaired or partially reworked, and then acceptance.
3, sign the completion acceptance
Both parties fill in the completion acceptance form one by one according to the inspection results of each renovation project. Its content includes the name of the renovation project, project quantity and quality assessment. The column “Disposal Method for Assessment of Disqualified Projects†in the acceptance checklist shall be decided by both parties, stating that the decoration company shall be responsible for repairing or rework, and the decoration company shall be responsible for those who are permanently impaired due to difficulty in repairing or rework. Compensation.
4, recover more than expected material
After completion of the acceptance work, the user shall clear the remaining materials from the purchased materials for repair and use in the event of future repairs. For materials that have a shelf life, if the owner does not want to save it, he can negotiate with the decoration company for a discount, or he can handle it separately.
Construction acceptance decoration design window decoration find decoration company okay
Waterjet High Pressure Parts For Fl
Waterjet Universal Check Valve Waterjet Cutting Parts Check Valve For FL 60k Intensifier Parts Waterjet Nozzles Waterjet Check Valve Body Water Jet On / Off Valve Repair Kit Water Jet End Cap Assembly Hydraulic Piston For Waterjet Plunger Pump Seal
Inlet Poppet Retainer |
Waterjet Abrasive Mixing Chamber Sealing Head Gland |
Flow Waterjet Parts,Waterjet Air Actuator,Hydraulic Lift Cylinder,Water Jet Cutting Parts
Foshan Hairan Machinery And equipment Co.,LTD , https://www.hairannozzle.com