Home decoration acceptance essential knowledge points

Material acceptance

In the home improvement process, there are many disputes related to decorative materials. To sum up the reasons, it is nothing more than people often say "the shuffling of the construction party", and "the owners of the material supply will affect the construction progress and quality." Therefore, material acceptance must be done during the renovation.

Material acceptance:

• Inform the other party of the acceptance time of the material: After the material is purchased, the purchaser needs to notify the other party of the contract to prepare for acceptance of the material. And this acceptance is best arranged as soon as the material comes into play. Therefore, the agreed acceptance time is very necessary. In order to prevent material from entering the market, the other party does not have time to accept the material and affect the construction progress.

• The acceptance personnel specified in the contract must be present at the time of material acceptance: Whether it is the person in the home improvement industry or the consumer, it seems that the contract has not risen to the legal point of view. However, the home improvement contract itself is a legal document and it may cause unnecessary trouble if it is not taken seriously. Take the material acceptance as an example: In the relevant chapters of the home-installed contract, the author once suggested that the material acceptance should be clearly defined by the acceptance person. However, in actual operation, parties A and B of the contract often do not take seriously the material acceptors specified in the contract. It may be that the acceptance person specified in the acceptance inspection is not present (the acceptance person has not authorized the acceptance person as contracted). Maybe the acceptance person is on the scene but he has no responsibility for acceptance. Strictly speaking, there are legal loopholes in doing so.

Acceptance procedures must be rigorous: The inspector should perform the necessary inspections for each material contract specified in the contract, such as material quality, material specification, and material quantity.

The inspector specified in the contract shall sign on the acceptance form: If the inspection result material is qualified, the inspector shall sign the material acceptance form. This is a more complete process. Because the author encountered such a thing, the owner accepted the material when the material came in, but did not perform necessary procedures at that time. Afterwards, the owner repented, and he refused to accept the results of his acceptance. However, since the other party has no evidence in hand, there is no way to do so.

Green Decoration Acceptance Memorandum Nowadays, more and more consumers have turned blindly to the visual effects brought by the decoration style and color of the living room and instead pursued an environmentally friendly, comfortable and convenient home environment. Those who were once classified as “fashionable” but tedious The useless style decoration is no longer beautiful, people-oriented green, practical home design has become the first choice for people, so that occupants in the limited space to fully enjoy the family's warmth and comfort.

Consumers' thirst for healthy homes has caused many home improvement companies to raise their green flags. However, some companies only use the building materials that use the “environmental protection” and “green” signs, but it is difficult to make green after the renovation. Confirmation and guarantee. Therefore, home improvement companies that really use high-quality, environmentally-friendly building materials and construction techniques and implement “full-scale green control” while providing inspections by authoritative indoor air quality testing departments will be favored by consumers.

To know if interior decoration is green, you must first understand what is green and what is green decoration before you really know how to check it.

Green, original meaning natural, original environment. In the 1960s, after Japan’s Ministry of International Trade proposed “environmental materials”, the scope of application of the word “green” was expanded, and the scope was wider and wider. However, all the words used were nothing more than a symbol of vitality, beauty, vitality, and peace. And no pollution. Greening mainly refers to afforestation and planting of flowers.

Green decoration, in a nutshell, is that the decoration should meet the above green meaning, while the green fine decoration should also be added with "precision craftsmanship."

To sum up, the so-called green decoration is based on "natural, safe, beautiful, concise, comfortable and low-cost as the goal, to carry out a healthy, conducive environment, beneficial ecology and appropriate amount of decorative flowers decorated." It includes six basic links, namely: scientific design, environmental protection building materials, standard construction, green supervision, quality supervision and appropriate flowers. Among them, environmental protection building materials are the core and the first key; design and construction are the second key; green supervision and quality supervision (rational) are the guarantees, and flowers are the conditions. It is important to point out here that the key to renovation is the use of green (environmental) building materials, which is the basis for green decoration. Otherwise, even if you implement advanced scientific design and re-standard construction, it will not help. However, if you choose to use environmentally friendly building materials, excessive use of the same materials can also cause some pollution. For example, after calculation, the use of environmental protection Daxin Ban, the use of materials for the 100 square meters of space, the material should not exceed 140 square meters Otherwise, there is the possibility of poisoning. Excessive use of adhesives can also have negative effects. Another example is the rational design of ventilation, lighting and the kitchen is important for antifouling. Therefore, the former is the core and the first key, while the latter two are the second key, but it is also important. Green supervision is essentially the detection of indoor harmful substances. It ensures that the decoration is green and plays a sole and decisive role in green decoration.

Quality supervision (rational) is to ensure that the quality of the decoration is in line with the standard. It should also be pointed out that quality supervision should be carried out during the decoration process and immediately after completion. Green supervision should generally be conducted 20 days after completion. This is because the harmful main substances such as formaldehyde and benzene need to be ventilated for a period of 20 days. Dissipation (formaldehyde sometimes dissipates after years); In addition, the inclusion of quality supervision as an important part of green decoration is due to the lack of quality green decoration, which is in fact incomplete and unacceptable; It is a necessary condition for green to put a proper amount of useful flowers in it.

In short, the so-called green decoration inspection is based on the above-mentioned green decoration and the six link criteria, using two supervision to carry out acceptance, the match is a green decoration, otherwise it is not a green decoration. Green decoration is realistic and can be done through hard work.

In addition to appraising the overall effect of decoration, the mid-decoration project acceptance inspection mainly depends on whether the quality of the hand is satisfactory. Acceptance can be identified from the following aspects:

? Lighting circuit layout to comply with the regulations, sockets, lighting switches, total gates, leakage switches, etc. should have a certain height, kitchen, air conditioning should be dedicated line laying, television antennas and telephone lines to be installed in a convenient location for maintenance.

? Drainage should be smooth, no leakage, backflow and water phenomenon, high-grade water parts without clamping and scratch phenomenon.

The new masonry walls shall be vertical, the bricks shall have the same level, the seams shall be even and tidy, the brick joints shall not exceed 1mm, and the overall tile error shall not exceed 0.8cm.

The overall production error of the plane ceiling does not exceed 0.5, and the board-to-board gap does not exceed 0.3 mm; the plastic ceiling error does not exceed 0.5 mm.

The wood seal line, corner line, waistline veneer meet the seam not exceeding 0.2mm, the line and the line mouth slot joint does not exceed 0.3mm, the veneer and the plate meet not exceed 0.2mm, the sliding surface error does not exceed 0.3 Mm.

The paint should be smooth, feel good, no traces of scratches, no color difference and nailing within one meter.

The wall surface is straight and there is no obvious convexity and color difference within one meter. The construction quality is related to the quality of the construction team; it is also related to the unit price of the construction project. The best way is to sign a contract between the two parties before the start of construction to clarify the decoration requirements and acceptance criteria.


Late acceptance of renovation
Acceptance of woodworking (1) Whether the structure is straight. Whether horizontal or vertical, the correct carpentry practices should be straight.

(2) Is the corner accurate? The normal corners are all 90 degrees, except for special design factors.

(3) Whether the spelling is strict and accurate. The correct wooden pattern is to be seamless or to maintain a uniform distance.

(4) Whether the radian and roundness are smooth and sleek. In addition to a single, a number of the same shape to ensure consistency in the shape.

(5) Whether the cabinet door switch is normal. When the door is open, it should be light and no noise.

(6) There should be no gaps in the fixed wall of the cabinet.

(7) Whether or not the woodworking project is broken. It should ensure that the surface of the woodworking project is flat and there is no drum or breakage.

(8) Symmetrical carpentry items are symmetrical.

(9) There is no repair in the decorative panel nails. Of course, this is the painter's job, but as it exists in the woodworking project, it is mentioned here.

(10) Whether the connection of the ceiling angle line is smooth and whether there is any obvious unevenness or deformation.

(11) Whether the skirting line is straight and accurate on the ground.

(12) Whether the ceilings of toilets and kitchens, such as aluminum gussets and PVC gussets, are flat and have no deformation.

(13) Whether the cabinet door handle lock is installed correctly and normally open.

(14) Is the bedroom door and other doors open? When closed, the upper, left and right door joints should be tight, and the lower door gap should be moderate, generally 0.5 cm.

Acceptance of paint (1) Whether the surface of the furniture contaminated oil is saturated or not. Make sure there are no blisters, no cracks, and that the paint thickness is uniform and consistent in color.

(2) Whether the surface of the furniture varnish has the same thickness, the paint surface is saturated, clean and free from particles.

(3) Whether the emulsion paint on the wall surface is flat and reflective, there is no emptying, blistering, cracking phenomenon.

(4) Wood and plasterboard ceiling paints are generally latex paints and should have a smooth surface with no cracks at the board joints.

(5) Whether the connection of the ceiling angle line is smooth, there is no obvious wrong and distortion.

(6) The wallpaper patchwork is inaccurate and does not tear. Patterned texture patches should be accurate and error-free.

(7) Whether there is no pollution on the wall surface, no stain exists.

? Mason acceptance (1) whether the brick surface is flat, no tilt phenomenon.

(2) Whether the gaps in the brick surface are regular and uniform.

(3) Whether the toilets, balconies and kitchen floor tiles with floor drain have sufficient self-drainage inclination.

(4) Whether the brick surface is broken and collapsed.

(5) The tile orientation is correct and there is no reversal.

(6) Whether the tile and waistline position is correct, there is no biased position or the height is wrong.

Acceptance of metal engineering (1) Whether the metal body structure is straight; if the window part, it is required that the sealant and other closures are complete.

(2) Whether the metal form is flexible and has no obstacles.

(3) Whether the pipe joints of anti-theft nets, security doors, etc. have been polished, have a stable placement, and have not loosened.

(4) Whether the specifications and wall thickness meet the requirements.

(5) There is no leakage of rain between the window and the window.

Miscellaneous acceptance (1) In accordance with the provisions of the contract item, whether or not the project items are all completed.

(2) Whether the lamps are all on.

(3) Whether the engineering waste has been completely cleared.

(4) Whether the sanitary fixtures and other installations are installed correctly, whether the toilets include water storage and flushing, and whether the basin drainage is normal.

(5) There is no blockage in the floor drain.

Decoration points Paint decoration design Home Furnishing window switch Bedroom Door decoration style Kitchen sliding door Cabinet door Kitchen cabinet door Bedroom door Bedroom door Bedroom lighting Home decoration Tile adhesive tile Specification Top grade ceramic tile Kitchen tile Balcony Tile Decoration Home bedroom lamp

At present, the bottleneck and disadvantage of large scale development and manufacturing of isotropic Graphite in China still exist: the design and manufacture of large, special cold and other static presses have not kept up with it. (2) other facilities not perfect, such as the large and super large (1200 mm) Φ graphite impregnated, roasting, graphitization, purification processing, special machine tools machining must be perfect.

Fortunately, there are now cold and other static press factory to start to design and manufacture the large specification (1200mm) cold isostatic pressing machine, if the successful two years can be put into production. At the same time, the development of large scale homogenated graphite is also used in the development of vibration-forming graphite, carbon/carbon composite materials, carbon fiber and other materials used in silicon crystal production.

In the face of such a huge graphite market prospect, and graphite profound understanding to the graphite pieces processing technology progress is the precondition that the future market share, the graphite with milling, car, plane, cutting, drilling, grinding and CNC (CNC), main products including graphite, graphite mold, such as thermal field static pressure graphite, High Purity Graphite, EDM graphite, graphite crucible, graphite flake, Graphite Powder for the SPD, all kinds of graphite profiled, etc., products are now widely used in solar photovoltaic (pv), mold, electronic semiconductor, electrical discharge machining, metallurgy, chemical industry, nuclear industry and quartz, etc. We hope to cooperate with you and develop together with you in the future.

 Graphite Shaped Parts


Graphite Shaped Parts

Graphite Shaped Parts,Shaped Graphite,Brushed Graphite Milk,Forged Graphite Milk

Fengcheng Ruixing Carbon Products Co., Ltd , http://www.lnfcrxts.com