Industrial park enterprise fire approval matters

News Related Keywords: No tags.

This item mainly refers to the "Regulations on the Administration of Fire Control for Construction Projects" ( Decree 119 ).

approval procedure

1 , fire administrative license.

Fire design approval and fire inspection

2 , record check

Fire Protection Design Filing and Completion Acceptance Fire Fighting Filing Inspection

by law

Regulations on the Supervision and Administration of Construction Project Fire Protection ( Decree No. 119 )

Article 13 For people-intensive places with one of the following situations, the construction unit shall apply for fire design approval from the fire control agency of the public security organ, and apply for fire protection acceptance to the fire control agency of the public security organ that issued the fire protection design audit opinion after the completion of the construction project:

(1) stadiums, auditoriums, public exhibition halls, museum exhibition halls with a total building area of ​​more than 20,000 square meters;

(2) The civil airport terminal building with a total construction area of ​​more than 15,000 square meters, the passenger station waiting room, and the passenger terminal waiting hall;

(3) Hotels, restaurants, shopping malls and markets with a total construction area of ​​more than 10,000 square meters;

(IV) Theatres with a total building area of ​​more than 2,500 square meters, reading rooms for public libraries, indoor commercial gymnasiums, leisure venues, hospital outpatient buildings, university teaching buildings, libraries, canteens, and labor-intensive enterprises Production and processing workshops, temples, and churches;

(e) Children's housing facilities for nurseries and kindergartens with a total area of ​​more than one thousand square meters, indoor children's activity places for children's playrooms, nursing homes, welfare houses, ward building for hospitals, nursing homes, teaching buildings and libraries for primary and secondary schools, Canteen, school dormitory, labor-intensive enterprise employees dormitory;

(F) a total construction area of more than five hundred square meters of dance halls, video halls, auditoriums, Kara OK hall, nightclub, entertainment halls, saunas, cafes, bars, restaurants have entertainment features, teahouses, cafes.

Article 14 For special construction projects with one of the following circumstances, the construction unit must apply for fire design approval from the public security organ's fire control agency, and apply for fire protection acceptance to the fire control agency of the public security organ that issued the fire protection design audit opinion after the completion of the construction project:

(1) Construction projects with densely populated places as listed in Article 13 of this Regulation;

(2) State office building, power dispatching building, telecommunication building, postal building, disaster prevention command and dispatch building, radio and television building, archives building;

(3) A public building with a single building area of ​​more than 40,000 square meters or a building height of more than 50 meters besides the first and second provisions of this article;

(4) A type of high-rise residential building stipulated by national standards;

(5) Urban rail transportation, tunnel engineering, large-scale power generation and transformation and distribution projects;

(6) Factories, warehouses, special stations and docks for the production, storage and handling of inflammable and explosive dangerous goods, filling stations, supply stations and pressure regulating stations for flammable and explosive gases and liquids.

Article 24 For construction projects other than those provided for in Articles 13 and 14 of these Provisions, the construction unit shall, within seven days from the date of obtaining the construction permit and the acceptance of the completion of the project, pass the fire prevention website of the provincial public security agency fire control agency. Design and complete fire protection record acceptance, or go to fire protection agency business acceptance sites of public security agencies to carry out firefighting design, completion inspection and firefighting records.

Construction project fire declaration

(1) Materials that need to be prepared by the construction unit for design review and design filing

( 1 ) Application Form for Fire Engineering Design Audit of Construction Project (Force Project Fire Protection Design Filing Form); (Provided by Fire Agency)

( 2 ) Legal identity documents such as the industrial and commercial business license of the construction unit;

( 3 ) Design Unit Qualification Document; (must be stamped and confirmed)

( 4 ) Firefighting design documents; (Instructions)

( 5 ) Other materials required by laws and administrative regulations.

( 6 ) If it is necessary to handle the construction project planning permit in accordance with the law, it shall provide the construction project planning permit approval document; if the temporary construction that is required by the urban and rural planning authority in accordance with law shall belong to the crowded place, the certification document approved by the urban and rural planning authority shall be provided.

( 7 ) Photocopy of the construction permission document ( Design and record project must be provided, design review project is not required )

( 8 ) In accordance with the relevant provisions of the administrative department of housing and urban and rural construction to review the construction plans, a copy of the examination documents issued by the construction drawing examination agency shall also be provided.

( 9 ) Copy of corporate identity card, copy of authorized ID card, power of attorney, etc.

(II) Documents that need to be prepared by the construction unit to apply for fire inspection, completion acceptance, and fire protection records

( 1 ) Application Form for Fire Protection Acceptance of Construction Projects (Construction Project Acceptance and Firefighting Filing Form); (Provided by Fire Agency)

( 2 ) Project completion acceptance report. (According to the "Qualification Inspection Station Construction Project Acceptance Record Form", the five-party seal confirmation)

( 3 ) Engineering as-built drawings for firefighting facilities; (copy available)

( 4 ) Firefighting product quality certification documents; (fire hydrant, fire extinguisher, fireproof paint, automatic firefighting facilities and other product inspection reports)

( 5 ) The building components, building materials, and decoration materials with fire performance requirements conform to the national standards or industry standards, and the factory certificate; (mainly building exterior insulation, wall core insulation materials inspection report, this report can Prove fire resistance.)

( 6 ) Fire-fighting facilities inspection and certification documents; (The enterprises that set up automatic fire-fighting alarm systems and automatic sprinkler systems shall be tested through fire-fighting. This test shall be undertaken by a qualified intermediary structure.)

( 7 ) Proof of legal identification and qualification grade of construction, project supervision, testing units;

( 8 ) legal identification documents such as the industrial and commercial business license of the construction unit;

( 9 ) Record of hidden works related to firefighting facilities. (provided by the construction unit)

( 10 ) Fire design change notification. (No table is not required to provide)

( 11 ) Other materials required by laws and administrative regulations.

Basis of punishment

Article 58 Whoever violates the provisions of this Law and commits any of the following acts shall be ordered to stop construction, stop its use, or suspend production or business, and impose a fine of 30,000 yuan up to 300,000 yuan:

(1) Construction projects that are subject to fire protection design audits by fire control agencies of the public security organs in accordance with the law, and shall be constructed without authorization if they have not been audited in accordance with the law or failed to pass the examination;

(2) The design of fire protection fails to stop the construction after random checks by the public security organ fire-fighting institutions;

(3) Construction projects that should be subject to fire inspection and acceptance according to law have not been put into use without authorization after failing to pass fire inspection or failing to pass fire inspection and acceptance;

(4) After the construction project is put into use, it shall be checked and unqualified according to the law of the fire control department of the public security organ, and shall not be stopped for use;

(5) The place where the public gathers has not been checked for fire safety or has failed to meet the fire safety requirements by inspection, and is put into use or business without authorization.

If the construction unit fails to submit the fire design documents to the public security organ's fire control agency for record filing in accordance with the provisions of this Law, or fails to report to the public security organ's fire control agency for filing after completion, it shall be ordered to correct within a time limit and a fine of not more than 5,000 yuan shall be imposed.

Article 59 Any one who commits any of the following acts in violation of the provisions of this Law shall be ordered to correct or stop the construction, and a fine of 10,000 yuan up to 100,000 yuan shall be imposed concurrently:

(1) The construction unit requires the architectural design unit or building construction company to reduce the design and construction of fire protection technical standards;

(2) The architectural design unit does not carry out fire protection design according to the mandatory requirements of the fire protection technical standards;

(3) The construction enterprise fails to follow the fire control design documents and fire technical standards to reduce the quality of fire construction;

(4) The project supervision unit colludes with the construction unit or the construction enterprise to falsify and reduce the quality of fire protection construction.

The information in this article comes from the Internet and was reorganized and edited by China Rescue Equipment Network.

Product

 Card Material Polycarbonate Overlay

Model Number

TH832

Thickness 

0.05/0.075/0.125/0.175/0.25/0.375/0.50mm

Width

max 1200mm

Packing

PE film+kraft paper+pallet

Advantage

Excellent strength and abrasion resistance, high and low temperature resistance, perfect image laser etching;

suitable for card body performance and anti-counterfeiting technology requirements, such as id card, driving license, e-passport, etc

Color 

semi-transparent 

Delivery time

Within 15 days after deposit

MOQ

 1ton

Payment term

30% deposit,balance within 7 days after BL copy;

100% L/C at sight

Certificate

ISO 9001  ;SGS;TUV

PC

PC Film

Pc Film,Pc Sheet Film,White Pc Film,Printing Pc Film

Shandong Top Leader Plastic Packing CO., LTD , https://www.sdzlplastic.com