Reminder: Several common misunderstandings in home improvement acceptance

Home decoration acceptance is a problem that every decoration owner is very concerned about. Acceptance works, but it will certainly cause trouble for future occupancy. From the approach of materials to the completion of each process such as water and electricity, paint, mason, carpentry, etc., it is inseparable from acceptance. Even after the completion of renovation, indoor air quality must be checked and accepted. However, the entire renovation project, not necessarily every consumer knows how to do a good job acceptance, often wait until the project is done, and then one by one acceptance, after the renovation is completed, there is no room for acceptance of indoor air quality Stay on the next. In fact, these are the mistakes of home improvement acceptance.

status quo:

Heavy results are not heavy process

Once, I heard the designer send this kind of emotion: It may be due to time. Now, some consumers rarely go to the construction site during the renovation process, so that after the renovation is complete, all the projects are accepted again. When the hidden projects such as hydropower were already well done, it would be very difficult for the customer to accept and accept unless it was reworked.

San Jian decoration company designer Yu Jianhui introduced: In fact, this is just a typical example of home improvement acceptance "heavy results are not heavy process." Some consumers even include the engineering supervision of some companies. They do not pay much attention to the acceptance engineering during the decoration process. When the project is completed, it is found that hidden works in some places are not done well, such as the bathroom and walls caused by poor waterproof treatment. Moldy and so on.

Ignore indoor air quality acceptance

Iowa, who lived in the Chancheng District government building, did a renovation of the new home at the end of last year. However, after finishing the renovation, he did not check the indoor air quality and he stayed. After his stay, his family felt very uncomfortable, and his father-in-law was After living in his home, he suffered from leukemia. After renovation, his home interior formaldehyde exceeded the standard 3 times.

What are the errors:

Yu Jianhui said that not only hidden projects such as water and electricity, but also paint, carpenters, masonry, etc., are required to undergo inspection and acceptance every time they are to be qualified, and then proceed to the next one, if they are all accepted after the completion of the project, There will be many unnecessary troubles such as rework.

For the indoor air quality after renovation, Yu Jianhui said: Although the decoration company uses the national environmental protection certification decoration materials when selecting materials, but because any material on the market is more or less Certain harmful substances, so in the process of renovation, it will inevitably produce certain air pollution.

Out of the error:

Pay attention to the process ahead

Acceptance and acceptance will begin when the material comes into play. Acceptance of materials depends on whether the materials are contracted brand materials, meet the agreed standards, etc. Second, in the hydropower project, we must do a good job in a timely manner, timely acceptance, supervision should also do a good job of supervision work at this time, strictly put each project off. For example, for the acceptance of electricians, we must do: the lighting circuit should be laid in accordance with the regulations, sockets, lighting switches, main gates, leakage switches, etc. must have a certain height, the kitchen, air conditioning should be dedicated lines, TV antennas and telephone lines to be installed in Locations that are easy to maintain; hydraulics are: drainage should be smooth, no leakage, backflow and accumulation of water and so on.

Regarding the inspection and acceptance of indoor air quality, designer Yu Jianhui suggested that consumers should not be eager to check in after the house has been renovated, and they must be vacant for at least one or two months. Moreover, he also suggested that the conditions of the family after the completion of the renovation is best to do indoor air quality testing, acceptance testing, governance and then stay again.

Construction Acceptance Interior Decorating Home Decorating Design Paint Switch Decoration Finding Decoration Company Okay Bathroom Design Toilet Waterproof Home Furnishing Home Furnishing Home Furnishing