Renovation lecture hall - interior decoration process

Renovation is a troublesome and time-consuming task. A decoration may take up to six months to complete. For beginners and decorating friends, first of all, we must master the basic flow of interior decoration, follow the process, do a good job of planning, step by step, will not be rushed during construction, the duration of a delay, the house is difficult to complete .


Dulux Nippon Paint

design

Determine the overall style. Color tone, mixed oil, door and doorframe window frame color, wall color, where ceilings are needed.

Design positions for furniture, home appliances, sanitary ware, etc. based on functional requirements in order to reserve hydropower locations. Custom-designed doors, cabinets, cabinets, furniture, radiators, etc. for the initial measurement design. Set the location of hydropower reform.

include:

Bed size, bedside tables, desks or computer tables, sofas, TV cabinets, dining tables;

Air conditioners, refrigerators, and washing machines; it should be noted that the washing machine should be well-prepared where it is (in the kitchen or the toilet) and what kind of (roller or pulsator) it should be. If it is placed under the countertop of the kitchen cabinet, it must be Before the cabinet design, submit the size and design the water (and make it suitable for partial waterproofing), so as to avoid the cabinets from being placed in small places and not to go in, bigger waste materials and space is not beautiful.

Toilet vanities, toilets (usually toilets have 30 and 40 two water holes), shower heads, floor wiper taps, mirrors (the next best to leave the socket in the future to insert a hair dryer or razor and other small appliances), mirror Headlights, etc.; if there is a shower room or cask, it is best to let the manufacturer come first to design the upper and lower water positions.

Kitchen sinks, fire pits and range hoods, oven racks, drinking fountains, (some families also need to disinfect cabinets, dishwashers, ovens, etc.). If the kitchen is made as a whole cabinet, it is advisable for the manufacturer to design the door in advance so as to determine the position of the above-mentioned kitchen appliance in general, so as to determine the position of the upper and lower water and the outlet in the future. It is important to pay special attention to what water heaters (solar power, gas, and gas) are used in advance to facilitate the deployment of hydropower in the future. If you can determine the size of the hood and the fire pits and sinks (no need to buy them first, be sure to write down the size)

The above red fonts need to know the size of things in advance, but do not necessarily buy it back, other things because of the relatively large size specifications, the choice of room is relatively large and other decorations can be bought after the end of the water, if there is a power supply can be based on Regular size is good in advance, and the problem is not much worse in the future. The upper and lower water can be docked with a hose.

Determine the location of various lights in advance; the position of the switch, the power outlet, and the location of various interfaces (network, cable, telephone, audio, etc.). Even if it is not used now, it is necessary to embed the power outlet in a place that may need to be expanded in the future. And various interfaces. For example, although it was planned to use on-hook air-conditioners some time ago, it is also advisable to leave air-conditioner-specific outlets in the future where the cabinets may be used.

budget. How much money to spend on decoration, you need to go to the decoration market to understand the price, the cost is as follows:

(1) Electrical materials (wires, switches and sockets, etc.) and electrician's manual fees (slotting fees, wiring fees, etc.);

(2) waterway material fees (PPR pipes and fittings, PVC) and waterway manual fees (pipeline fees);

(3) bricklaying materials fees (tiles, cement, sand, waterproof coating) and bricklaying manual fees (laying tile fees, guarantee fees, etc.);

(4) The general bricklaying of the waterway can also be done. The circuit is best to find a professional to leave. The trough can be finally leveled by bricklayers or oil workers.

(5) Woodworking materials (wood, Daxinban, Jiuli board, veneer, adhesive and white glue, nails, door and door locks, sill countertops, etc.) Woodworking manual fee (including door fee, window cost, Ceiling fees, furniture costs, etc.);

(6) Oil material costs (putty powder or talcum powder, gypsum powder, 801 glue, paint, latex paint, and some gadgets, etc.) (padding fee, paint cost)

(7) Other expenses: Toilets, washbasins, kitchen cabinets, faucets, vegetable basins, bathroom accessories, lamps, floors, curtains, etc. There is also the cost of furniture and home appliances.

Admission. The formalities for the admission procedures need to be the original and photocopy of the ID card of the person in charge of the decoration team, the original and copy of the owner’s ID, the copy of the business license of the decoration company, the copy of the construction company’s construction permit, and the decoration deposit, of course, before the application. Ask the owner’s house management office for details.

Reconstruction of the building structure. Demolition old. Demolition of walls, walls. Before the design, we must master the building's load-bearing structure and distinguish the removable part from the undetachable part. Under normal circumstances, in the implementation of unified property management of the district, in addition to the building's bearing walls, columns, all architectural components that affect the appearance of the building can not be changed, such as windows, balconies and so on. The wall-to-wall area can be calculated based on the floor plan of the house. There are various detailed data on the house. Remember that the amount of area that will be knocked against the wall before knocking on the wall is good. You must know that knocking the wall is based on the area.

Waterproof treatment. The toilet (kitchen) floor is closed for 24 hours

5 In addition to the construction of the waterproofing project as required, after completion of the waterproofing construction, a water storage test shall be conducted. Pay attention to the moisture-proof and moisture-proof furniture in the wet room to be arranged in the dry space. When using the wooden furniture to make the kitchen and dining room partition, waterproof treatment must be done; close to the bathroom cabinet, kitchen cabinet wall cabinet furniture The back also needs to do moisture treatment.

Hydropower renovation (hydraulician and plumber). The main tasks of hydropower reform are hydropower positioning, slotting, buried pipe and threading.

1 The first step of hydropower reform is the positioning of hydropower, which is based on the needs of users to determine the location of the switch sockets and the position of the waterway interface. The plumber should follow the position of switches, sockets, and taps to map the line to the user. clear. Moreover, we should pay attention to the principle of “taking water to the sky and electricity to the ground”. That is to say, the water pipes should go to the ceiling and the strong and weak electricity should go to the ground as far as possible, and the strong and weak electricity cannot cross each other and the parallel distance is greater than 30 centimeters.

2 The installation and design of the distribution box and information box must be considered for ease of use, concealment, and safety. It is also necessary to pay attention to the direct connection with the external main line; the electrical circuit cannot be hidden in the building's load-bearing wall or column.

3 The electrical circuit design of sockets, switches, and lamps must take into account the variability of the interior space, prepare for possible different space usage conditions, and reduce the barriers to re-planning design of some users during use, such as desks, decorative cabinets, The impact of the movement of electrical equipment on electricity use and water consumption should also be taken into consideration.

4 In the case of larger luminaire weights, pay attention to the embedded load-bearing components in the ceiling, not directly on the wooden wedge to avoid indoor unsafe factors.

5 After hydropower positioning, the next step is to slot. The slot played by a good groover is basically a straight line, and there are basically no hairs in the groove. Before making a groove, be sure to have a plumber mark all the water and electricity on the wall. Remember to compare the hydropower diagrams and see if they are consistent.

6 When the waterway is reformed, pay attention to the surroundings must be tidy. When waterway reconstruction is contracted, it is better to indicate the materials used for waterway reconstruction. In addition, the size of the water pipe in the original room should be taken into account in the reconstruction of the waterway, and the pipe of the external water pipe should be matched with the original water pipe. Hot and cold water pipes should be left hot right cold, the spacing is generally not less than 20cm, depending on the distance between the hot and cold pipe taps.

Experienced lacquer furniture decoration design socket window kitchen cabinet decoration find decoration company okay decoration partition decoration style marble table cloth sofa cushion family cabinet partition door fabric sofa bathroom door baby bed floor tile glass table glass dining table kitchen glass sliding door function sofa bed cloth sofa Mirror light partition cabinet Marble cabinet Glass door Function sofa Glass brick Cabinet door Marble tile Fabric bed Glass furniture Computer sofa Chair Counter glass counter Kitchen ceiling Ceiling curtain Kitchen cabinet door Bathroom tile Toilet partition Toilet door Toilet ceiling material Toilet door size Bathroom size Bathroom tile Color bathroom waterproof price bathroom ceiling bathroom sink

1 2 Next> Total 2 Page
Page to page
Function assignPage() { var page = $('#page_val').val(); if (/_\d+\.html$/.test(location.href)) { location.href = location.href.replace( /_\d+\.html/, ((page == 1) && 1? '' : '_' + page) + '.html') } else if(/\/\d+\.html$/.test (location.href)) { location.href = location.href.replace(/(\d+)\.html/, ((page == 1) && 1? '$1' :'$1_' + page) + ' .html') } } $(function(){ $('#page_form').submit(function() { assignPage() return false; }) $('#page_btn').click(function(){ assignPage( ); return false; }) }) See full story

Aluminium Tread Sheet structure of new, non-slip effect. Light weight, excellent durability. The quality of about 7kg per square meter, the tensile strength of 200N per square millimeter, aluminum extension of high relative elongation higher than 10%, can withstand high bending without breaking, good toughness.

 


Alloy series

Typical alloys

Material status

thickness(mm)

width(mm)

length(mm)

1 series

1060

H*2.H*4.T4.T6

0.8-7.0

300-2000

800-6000

3 series

3003

5 series

5052.5754

6 series

6061.6063.6082

 





Aluminium Tread Plate

Aluminium Tread Plate,Tread Plate Embossed Aluminium,Precision Aluminum Tread Plate,Tread Aluminum Alloy Plate

La Ya Aluminium products Co.,Ltd. , http://www.layametal.com