Home decoration construction process does not steal work

No matter which downturning process is used for house decoration, painters, ceiling workers, carpenters, and shop floors must be processed step by step, neither provincial nor indiscriminate. Otherwise, it will be a failure sooner or later.


Jun licensing solid wood floor Beautiful Island solid wood floor

Construction specifications for ceiling paint

The top latex paint is mostly used for algae ceilings and original top trims. The construction is divided into three stages: bottom layer treatment, brushing and sealing primer, and brushing topcoat.

The standard procedures are: sweeping the basement → filling the putty, partially scraping the putty, rubbing the surface → the first pass of the putty, smoothing the surface → the second pass of the putty, smoothing the surface → applying the brushing and sealing primer → brushing the first time Paint → Putty replenishment, leveling → brushing the second pass paint → polish and live. Since the veneers of suspended ceilings are gypsum boards or wood, in the handling of the base layer, the nail caps and nail holes for attaching the decorative panels should be emphasized, and the joints of the gypsum board facings must be provided with glass fiber mesh belts. The top latex paint finish is brushed at least twice. After each pass, putty should be repaired and lightly polished with sandpaper. Clean the surface float with a dry cloth and brush it again. Although the top latex paint is not very technical, it must be followed in order to obtain a satisfactory result.

Construction specifications for top paint

Brushing paint refers to painting the top with oily paints and enamel paints. It is mostly used for painting the top of kitchens and bathrooms in home renovations. It can also be used for algae ceilings and PVC ceilings. Its construction is mainly divided into three stages: bottom layer treatment, brushing coating and coating finishing.

The bottom layer is mainly composed of bottom layer cleaning, degreasing, repairing the top defects, and scraping and finding equal processes. To ensure the smoothness of the top, putty should be scraped at least twice. Brush the primer before applying the coating. The topcoat should be brushed at least twice. After every coat of paint is dry, it should be repaired with putty and sandpaper, and the damper on the paint film should be wiped with a damp cloth and then painted again. Coating finishing includes grinding, polishing and other processes. When sanding the surface, use water sandpaper. When polishing, clean the surface with a clean soft cloth and sand. The top paint is a very professional construction project. Only strict observance of construction regulations can guarantee the construction quality.

Wooden grille ceiling installation

The production of the wooden grille skeleton should be based on the accurate measurement of the roof size. The keel should be finished, the surface should be planed, the joint should be opened, and the horizontal and vertical keel joints should be opened with a half-groove joint. The flame retardant coating should be applied.

During the installation, according to the design, the elevation control line and the suspender installation line shall be popped. The wooden mold shall be drilled on the wall surface and the ceiling, and the ceiling hanging piece shall be fixed on the inner hook of the keel with a thick wire. When the installation is completed, the integral lifting method is adopted to move the wooden grille frame as a whole above the elevation line and connect it with the hanging piece on the ceiling. After all the hanging pieces are connected with the grille frame, the grille surface is leveled by adjusting the length of the hanging piece. After adjusting the grille frame to be level with the control line, fix the surrounding wooden keel to the wall. The surface treatment of the wooden grille skeleton surface is generally to paste more valuable wood thin pieces, install the lighting fixtures and close the decorative lines, the lamp base can be installed during the production of the wooden grille skeleton, and the power is turned on after the hoisting. The grille frame trim strips should be installed on the ground, and the ceiling installation should be followed by a closed line seal. After the wooden grille is installed, it is necessary to apply a clean oil coating to the finish, and then install the frosted glass after brushing.

Estimated duration of wooden grille ceilings

The wooden grille ceiling is a relatively labor-intensive and complicated project, involving many materials, preparation and production time is longer. After the installation, the surface paste, surface brushing, and glass installation need careful operation, detailed construction, and more man-hours. The technical level is higher. The wooden grille ceiling is about 15 square meters. It takes about 10 days from the start of stock preparation to the completion of the work. The dragon skeleton is processed and manufactured for 2 days. The stock preparation and installation are 2 days. The decorative decoration is 3 days. Others are waiting time for the craft. Intersection with other woodworking or parallel operations. The duration will vary depending on the degree of structure and the use of materials.

The effect of wooden grille ceiling

The wooden grille ceiling is different from other ceiling projects and should be attributed to the joinery decoration. The wooden grille ceiling is a method that is commonly used in home decoration corridors, entrances, restaurants, and large roof beams.

Wooden grille ceiling can not only beautify the top, but also can achieve the purpose of adjusting lighting and increasing the overall decoration effect of the environment. It requires generous design, reasonable structure, beautiful appearance, firm fixation, smooth surface, uniform color, scientific layout of internal lighting, complete paint finish, no scratches, no pollution, etc.

Construction procedures for ground stone and porcelain tiles

Floor stone and porcelain tile paving are the technical work that tilers often engage in in home decoration construction. The standard procedures for stone paving on the ground are: sweeping and finishing the grass-roots level → cement mortar leveling → high calibration, elastic line → installation of standard blocks → selection of materials → infiltration → pavement → pouring and cleaning → maintenance and delivery.

Construction specifications for ground stone and porcelain tiles

(1) The grassroots treatment should be clean, and the leveling and repair should be done first. Before leveling the mortar, the ground should be sprinkled with water to improve the bonding ability with the base layer.

(2) Paving stones and porcelain tiles must be placed in standard blocks. The standard block should be placed at the crossing point of the cross line and installed diagonally. When paving, each line must be hung in sequence. The stone must be soaked in water, and the back of the stone must be wiped clean. When paving, retreat from the middle to the four sides of the pavement. When placing the stone and porcelain bricks, they must fall at the same time in four corners, and use a rubber mallet or a wooden hammer to hit the compaction.

(3) The maintenance of stone and porcelain tiles after pavement is very important. After 24 hours of installation, they must be sprinkled and watered, and they are forbidden for two days. In order not to affect the construction of other projects, laying solid wood panels on the ground for people to walk on the ground stone, porcelain tile paving is a highly technical project, and its construction quality has a great impact on the quality of the entire home improvement project. The key projects of the entire project must be constructed in accordance with standard procedures to ensure quality.

Renovation process Lacquer paint Lacquer lacquer Decor Refurbished glass House refurbishment Entrance floor Tiles Glass bricks Kitchen glass Sliding doors Craft Glass grille Lamps Bathroom ceiling materials Bathroom design Bathroom ceiling Bathroom size Overall bathroom Restaurant Ceiling

rubber screw barrel

rubber screw barrel,Pvc Extruder Screw,Silicone Rubber Screw Barrel,Rubber Head Screw

Zhejiang Zhongsu Screw Co., Ltd. , https://www.zhongsuscrew.com