Doing 8 jobs can also be easily renovated in the winter

Winter has always been a busy season for decoration. Many people hope that they can enter a new house before the holiday, but the cold and dry environment in winter brings a lot of trouble to the decoration. If you have problems with the quality of your decoration in order to catch up with the progress, you have to do more harm than good, but as long as you pay attention to doing 8 things, your decoration will be carefree:
Notices on sanitary ware in Sanitary Ware in the United States : Firstly, determine whether the dry wall of the building wall is dry. The degree of dryness of the wall will directly affect the construction quality of the later wall. If there is a problem with the wall, try to perform back cover treatment (remove the original wall). After wall covering, roll the interface agent for back cover treatment). In addition, putty products with corresponding properties are used in the process of putting a putty, and latex paints with corresponding characteristics are used, and a latex paint primer is used.
Note two: Determine whether the base putty is dry or not. During the construction period, try to extend the time interval for scraping the putty. The reason for the climate in winter is that the drying speed is relatively slow, so try not to compress the schedule too tightly.
The water in putty cannot evaporate quickly when the heating is not connected. In this case, the first time the putty is not completely dry, the second time putty treatment is carried out, and the top coat of latex paint or wallpaper is applied. There will be a lot of hidden dangers - after the heating is turned on, rapid drying occurs, wall cracking or wall-to-wall edging will become inevitable!
In the case of warm ventilation should also pay attention to ventilation, the case of closed windows, excessive indoor humidity is not conducive to dry the wall, ventilation, try not to fully open the window, so that the temperature difference between indoor and outdoor will lead to dry enough!
Matters needing attention three: reduce indoor paint spraying construction winter temperature reasons, interior decoration paint spraying process is not conducive to paint volatilization, a large number of atomized paint will be adsorbed on the top surface of the wall or even the ground, the formation of secondary pollution.
Matters needing attention four: Slurry construction work attention to the antifreeze temperature will affect the cement condensation, and to prevent the anti-freezing of the cement mortar, if the room temperature is too low as much as possible to add antifreeze, and effective and reasonable maintenance procedures.
Note 5: Avoid premature coverage procedures such as the use of laying wood floor treatment, then do not rush to lay the wood floor after the leveling on the ground, to prevent the ground leveling of the cement layer is not completely dry to bring unnecessary damp to the floor.
Matters needing attention 6: After the wood is fully dried, the wood keels used for the construction of partial ceilings are basically not completely dry. The standard construction also involves planing and painting fire retardant coatings, so it is necessary to look at the degree of drying to perform secondary drying. It is eager to carry out the construction, and it should be carried out after a certain amount of air-drying to prevent deformation of the gypsum board after the construction.
Matters needing attention seven: wooden doors attention to anti-deformation cracking wooden doors in the installation as much as possible to close the state instead of long-term open state, open the door is free to go under the state, can be better closed in the closed state will not be deformed, subtle deformation of the door Close orthotic.
At the intersection of the door and socket interface, the line of the door cover and the seam of the wall will change with the change of the indoor temperature. Therefore, it is crucial to choose the form of the angle of the door pocket. Do not choose the stitching of 45 degrees as far as possible, and use direct stitching, such as cracking. Do not rush to repair, wait until the end of spring warming after a better one-time repair.
Note 8: Remember that the amount of stacking affects the use of too much material and furniture in a space with limited environmental protection. Although a single product already meets environmental protection standards, the increase in the amount of stacking used in a limited space will also result in environmental degradation. , so minimize stacking when staying at check-in. For example, wardrobes, wooden floors, wooden doors, bedside cabinets, dressing tables, TV cabinets, etc. are all superimposed in the bedroom at the same time, and they are closed for 10 hours. It is inevitable that they suffer from harmful substances. Therefore, ventilation should be done as much as possible before going to bed. At night, the bedroom door should be opened as much as possible.
Due to the seasonal nature of the winter decoration, the primary concern during the construction process and after the construction at low temperatures is environmental protection; the second is the avoidance of quality problems, and better solutions to the reasonable use of construction points and materials in the decoration.
Links: Uncovering the Three Pitfalls in the Decoration Construction and Countermeasures

Experience talk Lacquer Door Lacquer Cement Heater Bedroom Door TV Wallpaper Door Bedroom Wardrobe Bedroom Bedroom Door to Bedroom Door

Led Grow Light Bar

led grow light bar 600W, led grow light bar 800W, led grow light bar 1200W full spectrum led grow lights


01

02

03



led grow light bar 600W, led grow light bar 800W, led grow light bar 1200W, bars grow light

Yichang Green Eco-agriculture Co., Ltd. , https://www.plantgrowlamp.com