How can I learn how to apply floor tiles?

Floor tiles are common ground decoration materials in our decoration. Every family can see it. The construction of floor tiles will directly affect the daily use. What are the steps for sticking the floor tiles ? Today we will use the following content to learn to understand how to apply the floor tiles .

Sticking Floor Tiles - Soaking Tiles

Before paving, you need to first clean the selected tiles, placed in water soaked, not less than two hours. This is done in order to fully absorb the floor tiles, to avoid the tiles when drawing, absorb the moisture of other materials, affect the paving effect, but also effectively reduce the empty drum, Alice and so on. After the tiles are soaked, they should be wiped clean to allow later construction.

Sticking Floor Tiles - Leveling Lines

In order to ensure the smoothness of the floor tiles, it is necessary to find flat and elastic lines before paving. If the area is not large, you can directly find a transparent pipe with a diameter of ten millimeters, put the pipe on one side and the other on the wall. Space swings in different wall positions. Every time it swings to one place, when it is horizontally still, mark the mark, and then use the ink fountain to pop up the corresponding ink line on each side according to the marked mark. If you have a large space, you can use a spirit level to do the leveling, and you also need to use ink fountains for marking.

Sticking Floor Tiles - Pre-paving

Confirm the order and position of the floor tiles according to the above callouts, and prefabricate each tile according to the pattern and texture, and confirm the relative positions of the floor tiles, walls and lines. If the ground is a wool ground, you need to clear the ground floor and sprinkle water to make the floor wet. If the ground is smooth, you need to cut the hair first, then clean it and sprinkle it.

Sticking Floor Tiles - Formal Paving

After the above steps are all completed, it is necessary to formally begin to lay out the floor tiles, and the direction of the paving is mostly to be paved from the doors, windows or balconies, followed by paving from left to right. Need to want to wet the ground, and then evenly spread the cement mortar with a spatula on the back of the floor tile, laid on the ground in order, use a rubber hammer to tap the floor tile lightly, so that the cement mortar on the back more closely fit the ground. It should be noted that the tile paving mouth should be aligned with the horizontal line. After paving one line, you can use the ruler to level the horizontal direction. If there is a high part, you must use a hammer to knock it down and make the ground level uniform.

Sticking floor tiles - jointing treatment

After the floor tile is plastered, it is necessary to perform jointing treatment. After the floor tile cement mortar is completely dry, it can be constructed. More caulking agent or white cement is used for caulking, followed by smearing in the gaps between floor tiles and drying naturally.

Sticking floor tiles - cleaning and maintenance

The construction of floor tiles is easy to produce stains. Most of them are cement mortar. We can use rags to soften the stains on the surface of the tiles and make the floor more beautiful.

With regard to affixing floor tiles , Xiao Bian introduced it here for the time being. I hope to help you. If you want to learn more about floor tile decoration related content, you can pay attention to this site information, more exciting content waiting for you.

Floor tile floor tile

Scomi Prima 3G Shaker Screen

Steel Frame Shaker Screen for Scomi Prima 3G Shale Shaker

SJ-Scomi Prima Shaker Screen, also commonly called Scomi prima 3G/4G/5G screen, refers to the replacement screen for Scomi Prima series shale shakers. The main shaker models are including SCM-PrimaG 3P/4P/5P linear motion shale shaker and SCM-PrimaG 4PDD cascading shale shaker. Screen quantity correspondingly varies by the different shaker models. The whole screen cloth is divided into independent small surfaces by rectangle perforated holes to prevent the part excessive expansive damaged.

Technical Parameter

  • Mesh Material: stainless steel 304/316/316 L.
  • Frame Material: Q235 steel.
  • Screen Type: XL, XR.
  • API RP 13C Designation: API 20 – API 325.
  • Package: packed in paper carton, shipped by wooden case


Adaptable Shale Shaker Model

SJ-Scomi Prima 3g Shaker Screen are used as the substitute screen for

  • SCM-PrimaG 3P linear motion shale shaker (3-panel).
  • SCM-PrimaG 4P linear motion shale shaker (4-panel).
  • SCM-PrimaG 4PDD cascading shale shaker (4-panel).
  • SCM-PrimaG 5P linear motion shale shaker (5-panel).

Competitive Advantage

  • 100% interchangeable with OEM brands screen panel size.
  • SS 304/316 wire mesh cloth, triple layered sandwich construction.
  • Bonded to perforated panel, rugged structural support.
  • Manufactured according to the API RP 13C (ISO 13501).
  • Scientific & reasonable cost control system for competitive price.
  • Adequate inventory in the shortest time to meet customers' demand.
SG

Remarks:

Scomi, SCM-PrimaG 3P, 4P, 4PDD, 5P are marks of Scomi equipment INC.

ShengJia only produces the replacement screens but not original from Scomi.

scomi-3g-screen

Scomi Prima 3g Shaker Screen

Scomi Prima 3G Shaker Screen,Vibrating Screen Handbook ,Screening Equipment For Sale ,Vsm 300 Shaker Screens

Anping Shengjia Hardware Mesh Co.,ltd , https://www.oilshakerscreen.com