How to do 5 points of bathroom waterproof construction to avoid flooding the tragedy of the Seventh Army

The decoration of the bathroom is a part that cannot be overlooked in the decoration of the whole room, especially in terms of waterproofing. Because the waterproof project is unsuccessful, it will directly affect people's quality of life in the future, and even affect the residents downstairs, which will lead to conflicts between neighbors. So, how to do the bathroom waterproof construction ? From 5 aspects to explain, come and learn to see it.

1, bathroom wall ground leveling

What should be done in the waterproof construction of the bathroom? The wall and the floor should be leveled first. This is the first step. If the floor and the wall are not even, then the operation is superfluous. The method can use a certain proportion of cement mortar to level the wall and the ground, so as to avoid the leakage of paint due to uneven thickness.

2, bathroom wall coating waterproof material

After the wall is leveled, the waterproof material should be applied. This is one of the most important steps in waterproofing. As for waterproof coatings, it is recommended to select products that meet the national standards for waterproof performance, and the products should also be provided with a regular certificate of conformity. In addition, when smearing, should pay attention to the seams must brush in place.

3, bathroom wall waterproof height

Waterproof materials should be applied evenly and in place. At the same time, the waterproof height of the bathroom wall should also be taken into account. It is generally recommended to make a waterproof coating of about 30 cm high. The purpose is to prevent the accumulation of water from penetrating the bathroom wall. Because the bathroom is the most humid room in the entire room, the height of the waterproof coating on the wall of the bathroom is highly demanded. For example, if a bathtub is used at home, the waterproof coating is higher than the top edge of the bathtub.

4, toilet waterproof wall groove

Of course, the water tank groove in the bathroom should also be waterproof. When the pipeline, floor drain, etc. cross the floor, the waterproof layer around the hole must be carefully operated. The laying pipe shall be made larger than the groove of the pipe. The paint in the groove shall be full and smooth, and then the groove shall be evenly coated.

5, bathroom waterproof experiment must be done

Finally, after the waterproof construction of the bathroom is completed, the actual acceptance of this part is required to avoid the need for future repairs and the like. This is not only time consuming, but also time-consuming and costly. The test method is to block all the bathroom's drains, and build a 25cm high “can” at the entrance, and then pour 20cm high water into the bathroom. After 24 hours, check whether there is any leakage around the wall and floor.

Xiao Bian concludes: The above is the description of how to do the waterproof construction of the bathroom . I hope that through the knowledge of the above content, we should know how important the waterproof part of the bathroom is. Therefore, in order to avoid the serious and unimaginable consequences of the bathroom in the future, it is necessary to understand more about the waterproof construction steps of the bathroom. In addition, the usual use of the bathroom should also pay attention.

Bathroom waterproof construction

Function Supplying cold or hot water
Material  Brass 
Finishing Chrome
Cartridge Ceramic
Package Inner packing: Cloth bag, 
Brown color carton Outer packing: Kraft carton 
The package can be also done as customers' requirement
Product Technical Database
Material  Brass 
Surface Polish
Material analysis Cu≥59% 
Water Pressure Testing 1.6MPA 
Air Pressure Testing  0.8MPA
The Thickness Of Chrome Plating Nickel:7.5~9.5um Chrome:0.25~0.45um
Salt Spray Test 24 hours
Water flow bath/shower mixer≥18L/MIN, other mixer≥12L/MIN" "
Cartridge Life time  500,000 cycles 
Quality Guarantee 5 years Quality Guarantee
Environmentally-friendly, excellent resistance in corrosion and abrasion

 

                         

 

Packaging & Shipping

 

 

Packaging
Inner Cloth bag, white/brown/color box
Outer 8/10/12 boxes in craft carton
Shipping
Sample Order Ex-work by courier freight collect
Mass Order Ex-work, FOB Jiangmen by sea LCL/20'/40' ;  Ex-Work for air shipment

 

 

Our Services

 

One-stop Services

1. Evaluation & Quotation

2. Engineering & Development

3. Prototyping & Molding

4. Sampling & Production

5. Testing & Inspection

6. Assembly & Shipping

 

Our Strengths

1.We have been in sanitary ware field over 10 years experience.

2.We have our forceful specialist team Offer one-stop solutions to OEM

3.Customers Faucet 100% leak test before package

4.No matter you are small or big customers, you will receive the best service here

5.We guarantee customers high quality products with competitive price and excellent service

6.Timely delivery

Flat Shower Set

Flat Shower Set,Flat Rain Shower Head,Flat Pack Shower Mixer,Flat Hand Shower Set

KaiPing HuiPu Shower Metalwork Industrial CO,LTD , https://www.hp-shower.com