4 lessons worthy of experience

There are many standards for hydropower construction. We all hope that our own hydroelectric power can meet standards and even exceed standards. This is not a simple matter, and we need the years of construction experience of hydropower masters to understand. Today we look at four hydropower construction masters who have summed up their hydropower construction tips over the years so that they can learn from them when they supervise their work.

Do not completely sealed the unused box

If the original position of the box is not used in the new design, the construction personnel will not simply completely seal it, and it will be properly retained according to the actual situation to facilitate maintenance and threading, because an excessively long line pipe will be found in practical experience. The problem is that in the future, it is impossible to completely change the line, so the proper position of the original line box is properly reserved to facilitate the smooth passage of the line for emergency use.

Balcony waterproof slope treatment

In addition to hydropower, the hydroelectrician also has a small process that involves the construction of a waterproof slope on the bottom of all sealed balconies to avoid leakage of water from subsequent balconies and balconies, and careful and thoughtful construction experience.

Tin foil separates strong and weak electricity

The strong and weak electric crossover parts are wrapped with tin foil to reduce the magnetic field interference, and the length of the tin foil at both ends of the intersection is greater than 15 cm. When the owners watch TV and make phone calls, there will be no trouble with snowflakes and noises!

Detatch socket panel installed in advance

Because the socket panel does not enter the site during general hydropower construction, and the ceiling of the kitchen has been completed during the installation of the hydropower panel in the later period, it is not convenient to install the socket panel. Therefore, this is installed in advance to avoid future troubles.

Edit reminder:

Hydropower construction can be said to be one of the most important procedures in fitting-out. Hydropower as a part of daily high utilization rate directly determines the quality of the entire renovation. If the owners do not accept it, it is best to find a friend or a supervisor to check and accept, so as to avoid any worries.

Hydropower installation of hydropower acceptance hydropower reform hydropower stage

1. The three in one central non-woven fabric is made of inorganic antibacterial materials, which can play an antibacterial and Deodorizing role.

2. High quality polypropylene non-woven fabric, three-layer thickening protection design.The inner layer is composed of comfortable, soft and non irritant fabric, which can avoid itching and scratching.

3. Made of low sensitive materials, soft, comfortable and non irritating.Special design: soft elastic ear hook, not easy to fall off, can reduce the hand touch mask, elastic ear hook design can reduce the pressure on the ear

4. Ultrasonic seamless edge pressing can cover the nose, mouth and chin perfectly, providing comprehensive protection. Our masks provide a guarantee for your health and safety at work and when you go out.

Color: Blue

Package quantity: 50 disposable non-woven masks



Face Mask

Surgical mask,Medical mask,Best face mask,disposable face mask

Guangdong Giant Fluorine Energy Saving Technology Co.,Ltd , https://www.tuwtech.com