The beautiful joints of the old Wangjia tiles next door are really beautiful. How to do it?

In recent years, it is very popular in home improvement to make beautiful tile joints. The reason why the beautiful jointing agent is more and more popular among designers and owners is because after the beautiful joints of the tiles are completed, they can not only prevent the gaps in the tiles from turning black and mold, but also Beautify the gaps between tiles and add decorative beauty and effects; many of the neighbors in the community where Xiaobian is located are doing beautiful tile joints.

So how to make beautiful tiles? Are there any precautions? May wish to follow the editor to look down!

The beautiful tile construction tutorial is here! Get it done in only eight steps

1. Prepare tools and materials. 1 beautiful sewing agent glue qiang (so sensitive words are replaced by pinyin), several groups of beautiful sewing agent, 1 sewing ball and 1 blade each, 1 brush, 1 vacuum cleaner, 1 beautiful sewing wax, 1 groover One, a utility knife, a paper towel, a hot air qiang.


2. Clear the gaps between tiles. After the tools are complete, use the slotter, brush and vacuum cleaner to clean the tile gap once, and then repeat it again to ensure that the tile gap is clean and free of dust; in addition, there must be no water or moisture, if necessary, you can use hot air to dry Tile gap; the following picture shows the slotter to clean the tile gap.

3. Cut the glue nozzle, then install and mix evenly. First, use a utility knife to cut (bevel cut) the glue nozzle, pay attention to how wide the gap is, open the cut as much as possible, and don’t make it too big or too small; then install the glue nozzle on the beauty sewing agent, and hit about 40cm by the way. Don't worry, you can play more to ensure that the mixture is even.

4. Apply beautiful seam wax to the tiles to protect the tiles. The advantage of this is that it can not only protect the tiles, but also facilitate the shoveling of the gaps in the tiles after the curing;

5. Start glue application and press seam after curing. Use qiang (the sensitive word is replaced by Pinyin) to put the mortar into the gap of the tiles evenly. Pay attention to moving at a uniform speed and even force.

About 10 minutes after the end of glue application, press the seam with a compression seam ball (or tungsten steel sheet). It also needs to keep moving at a uniform speed and uniform force; the following figure is an example of glue application.

6. Wait for the curing agent inside the gap to basically solidify. Often the curing time will vary with the season and temperature. Generally, it takes only 5 to 8 hours to cure in summer, and it takes longer time to cure in winter or rainy season. You need to wait a few more hours. .

7. After basic solidification, shovel to clean the remaining material. The so-called surplus material refers to the material that is pressed by the squeeze ball (or tungsten steel sheet) to the edges of the two sides of the gap during the squeezing; after curing, the shovel is used to clean the surplus material. This process is called shovel seam, and the shovel is cleaning the surplus material. When you just need to pick lightly.

Supplement: The wax for beautifying seams mentioned above, if there is no waxing at this time, after the beautifying agent is cured, the blade will be more difficult to clean the remaining material, and may even cause scratches on the tiles, so waxing has many benefits; The picture shows the use of spatula to clean the remaining material, that is, the shovel gap display.


8. Finally clean up the sanitation, appreciate the labor results and the effect of tile beautiful seams. After the shovel cleans the gaps, clean the site and enjoy the construction effect of the beautiful sewing agent; the following picture shows the effect of the beautiful sewing agent.


Matters needing attention in construction

1. The conventional oil-based seam sealant should not be used outdoors or in direct sunlight areas. Because of strong outdoor ultraviolet light, the oil-based seam sealant is liable to yellow and affect the aesthetic effect. Therefore, epoxy colored sand is recommended for outdoor areas.


2. During the construction of the US sewing agent, if it encounters the rainy season or returns to the south, it is not suitable for construction, because the indoor is easy to get wet or get wet, which will affect the normal reaction of the US sewing agent, resulting in discoloration or dryness.

3. During the construction process, please try to avoid the dressing agent from getting on your clothes or skin. If you accidentally get it, please scrub it in time. Therefore, it is recommended to wear construction uniforms and gloves during construction!

4. After the construction is finished, please discard the used US sewing agent bottles in accordance with the local sanitation and environmental protection standards or garbage standards.



Top Chests and Roller Cabinets get different sizes of 27", 37", 42" and 56". 

Top Chests and Roller Cabinets

Rolling Tool Storage,Drawer Roller Cabinet,Roller Cabinet Tool Chest,Heavy Duty Roller Cabinet

Changzhou Xingsheng Tianhe Electric Appliance Co., Ltd , https://www.roller-tool-cabinet.com