Four standards for floor installation and acceptance

The surface of the paved wooden floor was planed and polished, with no scars, russia and burrs. The pattern was clear, the color of the clean oil surface was the same, the laying direction was correct, the surface seams were tight, the joints were staggered, and the surface was clean. The skirting boards have tight joints, smooth surfaces, and a uniform height and wall thickness. With a 2-meter ruler check, the floor lay flatness error is less than 1 mm, the gap width is less than 0.3 mm, and the flatness error of laying on the baseboard mouth is less than 3 mm, and the patch straightness error is less than 2 mm.


Scholarly aesthetic floor

The common quality problems and treatment methods of wood floor construction laying

The common quality problems in the laying of wooden floors are the sound of empty drums when walking, the unevenness of laying surfaces, lax seams, and local warping drums.

1, empty drum sound: The reason is due to the laying of wood flooring is not fixed, mainly Maoban and keel, hair board and floor nails a small number or nails are not strong, sometimes due to changes in the moisture content of the sheet caused by shrinkage or glue Caused by the failure. In addition to the strict acceptance of control methods, moisture content, adhesive and other quality, can only be used after acceptance, outside the installation should not be too little nails, and should ensure that the nails, after each laying a wooden floor, with no foot after the foot test sound loaded A piece, if any sound should be reworked immediately.

2. Laying uneven surface: The main reason is the laying of grass roots or wooden floor strip deformation due to deformation. During the construction of the paving, the horizontal ruler shall be used to check the level of the surface of the keel. If the paving is uneven, the paving shall be adjusted. Ventilation slots should be made on the keel. A 10 mm ventilation gap should be left on the edge of the wall. The insulation material must be dry to prevent arching after the floor is wet. The flatness of the wooden floor surface should be within 1 mm.

3, patchwork is not strict: In addition to the construction of non-standard laying, the width of the plate size error and the quality of poor processing quality is also an important reason, in addition to the construction of a serious inspection of the quality of the floor, the installation of Meikou should be tiled, Nail the nails in front of the board and use the module to mold the floor gaps before nailing.

4, local warping drum: The main reason for moisture deformation in addition to the board, there is a small patch of wool or seamless seam, the use of water pipes in the leak caused by wet floor. In the construction period, 3 mm gap should be left when installing the wool board, and wooden keel carved ventilation slots. After the floor is covered, the paint on the floor paint should be complete. In daily use, water should be prevented from flowing into the lower part of the floor, and the surface water must be cleaned in time.

Construction acceptance floor flooring floor paint