Squatting pan interface installation resolution squatting pan installation considerations

Squatting pan is one of the sanitary ware products that we will use in our daily life. The squatting pan brings convenience to our life. When we use it, many families have problems with the installation of the squatting pan . Talk about the installation method of the squatting toilet , and see how to install the squat toilet!

Squatting pan interface installation analysis

1. When the squatting pan is installed, it is necessary to reserve the space for the sewer pipe at the wall position of the installation position, and at the same time, determine the distance from the inlet of the sewer pipe to the ground plane.

2. The second step is to leave a squatting pan below the ground and the depth of the pit is greater than the height of the toilet.

3. Place the rubber plug that connects the squatting pan connector into the water inlet hole, and then apply a layer of glass glue or putty on the outer edge of the connection inlet hole, and insert the inlet pipe into the rubber inlet hole. Seal it well with a rubber plug to prevent water leakage.

4. Apply a layer of glass glue or putty to the edge of the water outlet of the squatting pan and place it into the inlet of the sewer pipe. Use coke slag or other filler to level the toilet bowl.

5. Open the water inlet system and check for leaks at the joints. If there is a leak, check the joints. Until the problem is solved.

6. After checking that there is no water leakage at the joints, fill the area around the bowl with fillers. At the same time, contact surfaces of ceramics and cement mortar should be filled with more than 1 cm of elastic material such as asphalt or linoleum.

7. The squatting pan is fixed in the horizontal plane with cement mortar, and it is stable and firm, and then the bathroom floor tiles are laid on the cement surface.

8. Try flushing and use if there is no abnormality.

Squatting pan installation considerations

1. All parts of the squatting pan that are in contact with the concrete should be filled with an elastic material such as asphalt or linoleum, otherwise the toilet will break due to swelling of the cement.

2. When using heat-dissolved asphalt to coat, prevent the toilet from being broken by heat.

3. The installation of the toilet shall be operated strictly in accordance with the instructions, otherwise the toilet will be broken.

4. The squatting pan flushing device mainly includes ball valve, high tank flushing, electromagnetic induction flushing valve, delay flushing valve, and manual flushing valve.

5. Avoid violent impact when installing and using.

The above is to give you a squatting device interface installation analysis, read the above description there is no more understanding of the squat toilet installation? After understanding this knowledge, after the renovation and installation will have more to understand, if you want to learn more For related information, please continue to pay attention to this site, more exciting so stay tuned!

Squat toilet installation

Motorized Electric Zebra Roller Shades

View Through Banded Roller Shades,Motorized Zebra Roller Blinds,Filting Light Zebra Roller Blinds,Soft Yarn Motorized Blinds

Shenzhen Yuaneng Industrial Co.,Ltd , https://www.bi-colour.com