200 decoration tips, you will need it later, spend less money

1, do not do the head of the shoe partition, leave a little space so that the gray shoes can leak to the bottom, installed above the sink and gas stove lights. When determining the location of a bathroom floor drain, you must first think about it and measure the size. The floor drain is best located on one side of the brick. If it is in the middle of the brick, the floor drain will not be the lowest point regardless of how the brick is inclined. 2, bathroom, air conditioning socket are not designed switch. Especially bathroom electric water heaters, with a two-stage switch with a plug is appropriate. If you want to turn off the electric heat, it is dangerous to pull the plug. 3, on the face of the tile corner part of the treatment, in the final analysis is to see the level of workers. If the masonry workers are in good condition and the tools for grinding tiles are good, they should not hesitate to grind the 45-degree angle. From the effect point of view, as long as the grinding is good, the practice of grinding the angle of 45 degrees is the most beautiful! If the worker's level is really not good, then you still have to choose to use an angle strip, because the bad 45-degree angle grinding method is not as good as the effect of the Yang-angle strip. 4. It is also very important to test the water pressure after the water pipes are arranged. During the test, everyone must be present, and the test time should be at least 30 minutes. The conditions are permissible, preferably one hour. Ten kilograms of pressurization, and finally there is no reduction to pass the test. 5, plastic steel doors must be considered when the size of the plastic steel door frame protruding wall, informed the installation staff, making the final door frame and finished tile wall is flat, so both beautiful and good hygiene. 6, the carpentry door package and the mason's tiling is also to match, when the package door, we must consider the following ground (door on both sides of the ground on either side) whether it is still tile or other cement mortar leveling thing, Because the door cover is nailed before the tile, it is always wrapped to the ground. In the future when cement is used, if the cement and the door cover are stained, it will cause the door cover to be watery and moldy. 7. The underside of the mattress and the bed board must be breathable. . Bed board is generally best with fir board 8, do the paint as much as possible with paper tape 9, to buy lamps to pay attention: generally try to use glass, stainless steel, copper or wood (shelf), generally do not buy what iron plating above what other plating ah, What kind of paint ah, easy to fade. 10, washbasin as far as possible with ceramic basins, glass basins are difficult to engage in health 11, hydropower reform to their own plans, ask them to open Cao according to a straight line. They looked at their lines and pressed Cao's lines. Each item must be checked and accepted. 12, waterproof must be done, we must test the water! 13. Many verbally-constructed agreements have become slaughtered at the time of checkout. They must be written in black and white. Items for increase or decrease must be clearly written and written out! 14. If the floor is installed, the ground must be renewed. Make the cement layer to redraw. 15, the kitchen door, or to decorate the carpenter to do wooden hanging rails as well. 16, the living room as much as possible to install the power plug. 17, outside the bathroom shower or partition. It is not practical to pull a shower curtain. It is practically inconvenient and the water flows across the floor. 18, to do the material of the door and door frame to choose the fine materials of wood. 19, before installing the cabinet must confirm that your home waterway is OK. 20, kitchen and floor tiles must not pick white. 21, the ceiling should pay special attention to wipe the putty to wipe Dulux 22, the living room lighting should not be too many parameters, simple as well, otherwise like a lighting shop! 23, buy those things that need to install as much as possible to require the installation of sales, it does not include the installation, we must insist on the completion of the installation before paying the full amount! ! 24, during the renovation, the business card of the manufacturer you collected before to carry the 25, aluminum buckle plate protective film is best removed before loading. 26, shoe cabinets are best to use shutter doors, deodorant. You can leave a socket on the side of the shoe cabinet to insert and bake shoes. 27, the place where you can cut vegetables can be a small lamp. 28. If it is convenient, the restaurant can also arrange air fans so that when eating hot pots or making barbecues, the ceiling of the hall will not be contaminated. 29, the best arrangements for the entrance of a cabinet to put debris, can be placed on the top of the shoe. It is very convenient to put commonly used things such as umbrellas, bags, scissors, change, drugs, and so on. 30, there is no need to use expensive ceilings, such as not too worried about the problem of moisture and soot, it is recommended to use waterproof gypsum board brush waterproof paint, a guest of my home to do so, very beautiful. If you must use aluminum buckle ceiling, it is recommended: 1, not too expensive. 2, the use of the net color, especially the kitchen ceiling, pure white is very good, and the color and white style unless matched, or it is easy to incoherent. 3, grasp their own ideas, do not believe the eyes of selling smallpox, their vision is really soil. 4, stare at the scene, close the edge is very important, do not let them sloppy, or leave a black seam, how to see how ugly. 31. The third day is mainly to drill holes and continue to put tiles. The exhaust holes of the range hoods and water heaters should be pre-punched. If they are well-sealed, then it will be inconvenient. Therefore, be sure to choose a range hood, stoves and water heaters before the renovation to determine the size of the hole. 32. Considering that the customized cabinets are good-looking, but not durable, after integrating the opinions and experiences of some students on the Internet, the cabinets are made of cement, with ceramic tiles on both inside and outside surfaces, marbles on the countertops, and cabinets and doors. Wood to do it. The cabinets thus made are durable and moisture proof. And spend not much. Many neighbors have said good things. This is not what I blow. 33. After the door covers are made, the plasterer begins to install the plaster lines and the wall ash project. The walls of my home were relatively flat, and 2-3 lanes would be sufficient. When the batch of ash is approved once a batch of ash, then brush the primer, brush after polishing, and finally with ICI brush finish two times, the entire wall looks smooth and smooth, really good. After the wall ceiling project was completed, the woodworking masters began to make wardrobes. The closet is made of 18cm Weiye brand big core board, and then the outer panel is decorated, although there is no furniture store to buy so beautiful, but durable, the quality should be better than to buy. I am not afraid to stand on the cabinet's board. I am afraid I will not be able to buy it. The backboard is also relatively thick and it is very thin to buy. 34, other students must pay attention to the following points in the tiling: 1 The best you can at the scene. 2 Partially imperfect tiles can make workers stick to some invisible positions in the future, such as cabinets, washbasins, mirrors, etc., but also pay attention to tiles, waist tiles, etc. Do not be attached to the above position by workers, or what will you do in the future? Can not see, but also spend money. 3 before the wall tiles and floor tiles are affixed, the immersion time must be sufficient. 4 Be sure to plug the ground drain and prevent it from plugging. My family's floor drain was blocked because of the loss of cement. It took 30 to find the management office to clear and get a lot of small mud blocks. 5 people at the scene, workers will not waste tiles. My family was not at the scene when I was tiling, but later I went to see it and wasted a lot of bricks. It was heartbreaking and my bloody Mi Mi. 35. The length and height of a wall. If a bathroom has four walls, measure the length and height of each wall. Then deduct one more window and door area. Finally calculate the area of ​​the ground. After you have sized it, you can also get a shop selling tiles, and they will help you meet again. Plus 5 percent of the loss on the line. 36, the bedroom's top light is best double-controlled, one by the door, one beside the bed, to save the big winter lying on the bed and turn off the lights. 37, the location of the socket must be considered good, height, interval. Even when I first hit the location of the cassette, I encountered a steel bar. After the box was placed, I found that it was just blocked by the TV cabinet, microwave oven, and desk. I had to move the first two furniture positions high and found that it was not only highly ergonomic, but also it could not be bought. Good stainless steel cabinet feet can only be customized aluminum feet. 38. It is only necessary to install one at a corner of the aisle, that is, bright and effective. 39. When the lamp was installed, the position of the table was not taken into account. Now the lamp is not in the middle of the table. 40, bathroom tiles do not use too prime, one is easy to dirty, and second, a long time too plain! 41. Sockets should be installed more, furniture should be bought outside, and the ground should be considered to be resistant to dirty and dirty. The sample room should be looked at more, and the principle must be adhered to. 42, aluminum buckle board does not have to buy high prices, very cheap aluminum buckle board has far better than the effect of PVC, and then spend more money and can not see significantly different results. Buy aluminum buckle board to pay particular attention to the keel instead of the aluminum buckle board itself (the goal of the aluminum buckle board is not easy to do the hands and feet), the keel often will be finished ghost. 43, the color of the floor tiles is difficult to find satisfactory, I did not find, but two kinds of unsatisfactory color intertwined and then turn a 45-degree angle can reach my very satisfied results. This good idea was actually suggested by the bricklayer. 44, when the cabinet on the top of the balcony, then the back of the cabinet with a layer of foam plastic insulation and waterproof effect is very good. Balcony doors are best not to use the same type of fire board. The balcony environment is rather harsh. 45, if not suitable wood lines may be customized, customized quality seems to be better than the sample. And customized more personalized. 46. ​​The stainless steel feet used in bathroom cabinets are profiteering. To find some of the store's back, the price is cheap. 47, install the lock should pay attention to the lock tongue on some wax, crashed and then on the wax later. If there is no door stopper, be careful to prevent the handle from damaging the wall. 48, Parker floor is very good, I like it, the only thing to remind is that talking directly to the boss may be better than talking to the salesperson about the price. 49, matt paint is more beautiful than a high-gloss 50, if the refurnishing will use finished putty instead of talc. 51, install the leakage protection device and the air switch junction box project can not save, and do not put on the outside to be placed In the room, I originally wanted to save money for the use of the old distribution box outside the door, and the electrician suggested that it should be replaced indoors. Now he finds this suggestion very valuable. 52, leakage protection and air switch to use the brand name. Used "Merlin Gerin". It is also simple to buy genuine goods. Call the phone number of the headquarters of Merlin Gerin directly and then call the local branch number. 53, under the basin than the above table basin delicate, good-looking, good cleaning. With the basin mixer under the table should pay attention to, taking into account the thickness of the basin, the leading mouth to be longer. 54, the top corner of the wall without any modification is also very beautiful, but in advance to find painters at the stage and the painter clearly put forward. The top corner line helps to straighten the top corner line. 55. Before the surface treatment of putty on the cement surface of the inline trough is very important, and it is appropriate to use a clean ball to treat the unsturdy surface. 56. Plaster is suitable for making up large holes in the wall. Of course, if the hole is too large, cement is needed. 57. The back of the frosted glass must be protected from paint. It is difficult to clean! 58. The cooking basin faucet must be able to be switched on and off with the back of the hand. The kind that must be used with fingers is not easy to keep clean. When the oil is on the hand, it is difficult to turn it. 59. The price of luxury automatic drying racks is too high. After comparison, some unfamous brands were found to be superior to the first-line brands in structure design, but the prices were much lower. 60, can consider using a metal socket installed on the ground, this socket is more than 100 expensive, but very convenient, usually flush with the ground, a foot can be popped out of the socket. Suitable for large living room. Or installed in the dining room under the table, used to insert hot pot (to prevent wires from moving around when walking back and forth) 61, storage room. Already TX has said, but I did not make the door, looks not very beautiful, the cabinet that puts clothes again is easy to be dirty. 62, bed starter (is it so called?). I bought a fabric bed for a professional bed company, and spent 350 yuan for such a thing. There is a handle at the end of the bed and the bed board will turn up to reveal the storage space underneath. It's great! 63, impractical double towel rack! At present, like the single pole use, it is basically not to put a towel on the inner layer of the hanging rod 64. I think the trash can inside the cabinet is not practical enough. It is better to put it outside. Do not install door-type trash cans and countertop trash cans, and opening the doors in the summer can be stinky. It is better to put the trash can outside. 65. It's good to have a small cupboard next to the table. 66. As far as I am concerned, mop buckets are not very demanding in terms of performance. They can build one out of their own. Tiles or mosaics that match the surrounding environment are beautiful and save money. 67. The bathroom can be used to hang things. 68, the bathroom designed a small cup of clothing, no longer have to worry about taking a shower to get clean clothes. 69, washing machine drying is not very practical, in addition to the only yellow day of the year, but also huge. Thick clothes and bath towels are still not dry enough for the sun to disinfect. Even if it is overdrawn, you need to save some money. 70. I even made a laundry pool in the laundry room for hand washing. Originally thought less, so I bought a very cheap Teli. Unexpectedly, this laundry pool was so convenient that it became the washing area with the highest frequency in my home. What rags, socks, and towels are all washed inside, and most of the washing hands are there. 71. It is really impractical to install light strips. The decoration has not been opened until now. When a guest comes in, it's just a spotlight on SHOW. I have forgotten to install this thing. Originally, it was romantic when she wanted to open PARTY. Now there are not many opportunities to open the lights. 72, the biggest experience is that in fact the decoration is as simple as possible, less pollution, less money, worry. 73, practical stuff: 1 design a reasonable storage room. 2 The sink for the washing of the north balcony. Distinguishes the washbasin from the bathroom and the kitchen's dishwashing and dishwashing bucket. 3 Toilets can be pulled out of the faucet. (The exception is TX, which is never washed in the basin). 4 Easy to clean floor and suitable cleaning tools. 5 kitchen countertop work lights. 74, buy a toilet must measure its own hole distance, or buy it and return it is really ... ... 75, after the kitchen floor tiles do not do a good job before the best level of measurement, see the lowest point is not a floor drain, to After waiting for it to dry up, he would wrestle with the decoration team and die many cells. 76. The windowsill uses the pearl of the Great Wall, which is an 800X800 tile. Manufacturers cut edging and plastering. The pattern does not look good yet. 77. The size of the shower room in the bathroom must be large enough, and transparent glass should be used so that the shower will not appear cramped. 78, tile joints should not use white cement hook. Without a month it becomes black and it is ugly. As a result, he bought a hooking agent for himself. The tired 79 should have a backboard under the artificial stone of the cabinet. After the installation, he found that he did not, and now he did not dare to cut the meat on it. He promised to replenish it for almost two months. It hasn't been installed (only once polished). 80. Don't believe the designer's confusion. Of course, you can visit several decoration companies and extract the real useful things from each design. The key is how you want to dress your home. 81. If the floor drains the original developer has already installed the "bowl" of stench, don't take it out. 82. After the bathroom floor tile has been attached, test the water and if the water flow is relatively slow, rework it immediately. The family's water flow was relatively slow. At that time, my heart was a little soft. Now when I take a bath, I always have a little water, and the shower heads of our main guards are idle. Now I am wondering how to remedy them. 83, when you wash the basin, consider the relative position of the mirror, brushing the cup, and the towel rack. 84, when buying a mirror to consider the position of the mirror headlights, if you do not want to install mirror headlights, the size of the mirror should be able to cover the line reserved for the mirror headlights best. 85, put the washing machine on the balcony to be a small cabinet, easy to put some debris, such as debris inside the detergent. Both beautiful and practical 86, must stare upstairs to do waterproof .... or downstairs dripping water, get a wall cabinet, the wall is a mess .... 87, do not blindly follow the online buy, I later found Some of them will bargain more cheaply than group purchases. 88. A certain number of sockets, televisions, DVDs, etc., must be set on the TV background wall. You will find that the socket is not enough. 89. Before changing the waterway, consider what kind of washbasin you have in the future, such as the left or right basin, and where the influent and drain water should be located. Otherwise, only after the change did you find that the washbasin in the phase was not fit! 90. Regarding the curtains, it is best for everyone to keep a copy of the size of their own. The owner must be able to describe the size of the curtain. If there is less, how is it? Or he looked at his cutting cloth. 91, the decoration of the construction process: (1) approach, demolition of walls, walls. (2) The toilets and kitchen floors are closed for 24 hours (developers are required to complete this task). (3) Chiseling trough, hydropower reform and acceptance. (4) Embedding of the concealed hydropower project in the trunking, and the water-sealing experiment began without leakage to start the waterproofing project. (5) Toilets, kitchen wall magnets. (6) Carpentry approach, hanging ceilings, plaster casts. (7) package door cover, window cover. Make wooden cabinet frame. (8) Simultaneous production of various wooden doors, modeled doors and flat pressure. (9) Wooden panel brush dustproof paint (clean oil). (10) The windowsill marble countertops are levelled and laid. (11) Wood veneer paste, line production and fine installation. (12) Wall base treatment, grinding, leveling. (13) Houses are glued to the edge of the door (protection edge). (14) Wall oil ICI at least three times. (15) Furniture paint enters the field, repairs nails, and paints. (16) Treat corners, laying floor tiles, solid wood or composite wood floors, waterproof marble strips, baseboards. (17) Fixtures, fixtures, handles, door lock installation and adjustment. (18) Clean up the hygiene, fill the floor tiles and remove the floor. (19) Initial inspection of interior decoration company. (20) Formal acceptance of the three party appointments is delivered to the owner. 92. Before the flue valve is installed, it must be cleaned to ensure that the valve can be switched freely and can be opened to the maximum, otherwise it will affect the smoke exhaust effect. Can be installed in the ceiling when the two do not install, such as the hood installed and tested correctly after the ceiling installed. 93. In such a large space as the living room and the dining room, ceilings can't be done without doing. 94, when you want to take a good air-conditioning line, take the power supply as close to the air-conditioning as possible, so as not to see a power line when installing air conditioning, leaving a pity. 95, personally measure and record the various dimensions available in the house, you can cover the size of the floor plan and then re-leaded, the final size will directly affect the decoration design and furniture purchase. 96. The line is not good for small apartment If you choose black walnut is always not enough atmosphere, then you need to choose, or move to the actual or perseverance of their own ideas, of course, the best both of them 97, began looking for decoration personnel. As far as personal experience is concerned, if it is not particularly large and it is intended to be simply renovated, it seems that it is more cost-effective to find guerrillas. It is best to introduce after someone else has installed it. You yourself have also seen it and recognized it. It is particularly important for the person in charge of the decoration. The sense of responsibility and appreciation is more important. The former is more crucial because if it is only a paperback, it is actually alive. Almost all the outside will be mixed, but the quality is good or bad depending on the sense of responsibility. 98, the main furniture such as sofas, wardrobes, dinettes, cupboards, etc. is best to see more in advance, if you run around too tired, you can find a few good shopping environment, large home square stroll, the basic trend to see It's coming out, so what you have to do next is to filter out the right things based on your own style. Some people have a better grasp of styles, and some people have a good grasp of color. It does not matter. There are still time to consider. If you wait until the decoration clearance site, the virtual steps to see the furniture will inevitably be reluctant to accept the final will not be very like. 99. It is best to write down the size of the furniture that has been considered good, and then go to the virtual future of the room. 100. The necessary documents must be kept when purchasing things. This is absolutely beneficial to the situation of refunds and exchanges that may exist in the later period. In particular, some important items such as shopping tickets and manuals, etc., because many things have a warranty period, the loss of certificates would be more troublesome. 101. The increase or decrease in the construction process must always ask the price and then write it in black and white. 102. Check whether there are necessary construction protection measures. For example, the entrance door must be wrapped in Zhenzhumian, and the well-paved windowsill and the ground should be properly protected. 103. Communicate with the construction staff as much as possible to determine if he understands your intentions. Respect and respect each and every master's work, respect him, and make people feel their own importance. Is it more responsible for doing something? Is there an old saying that is not called "undoubtedly?" (But if you are dealing with treacherous, bullying, hard-nosed people, then you have to fight for one's teeth and argue with reason.) Especially in the case of marginal projects, which require several types of jobs, the responsible workers will coordinate with each other to perform their duties. Otherwise, everyone kicks the ball back and forth and shirks responsibility. Like my Mason, I helped solve some of the carpentry things, and the electrician solved some of the problems of the mason. Because each master's experience is different, as long as he is willing to help you find a solution. 104. It is best not to do fixed furniture, because it may be that some layouts cannot change. If you must do it, you must grasp the quality, or you will have endless trouble. 105, to change the water pipe must be careful, one is costly; Second, if you do not ceiling you must go from the floor under the water pipe, in case of water pipes out of trouble. 106, according to their actual needs, reasonable arrangements for wiring, so as not to waste (especially cloth a lot of lights and spotlights does not seem to be practical, we must also use to avoid series, waste electricity), but some places can not save, such as Next to the bathroom mirror, always use a hairdryer and a razor. If there is a socket inside or under the shoe, it's not bad. You can use a tumbler. I don't regret it now. 107, bathroom to wet and dry as much as possible, if the area is small with a pedestal like (special display glass basin dirty, lazy to use with caution); conditional set up a waterproof cabinet to store debris best, what are placed outside sure It does not look good. 108, wood brushing glossy white paint when the polyester is better than the X (this is to listen to experienced painters speak). 109, cabinets must be carefully selected, to compare the quality of several more, do solid and strong to do it, because this one is now moving thousands of oceans, and related to the stove sink, etc., so still do not blindly greedy cheap . However, it is best not to make garbage cans on the countertops or in the inside. There is also the question of whether baskets, seasoning baskets, or rice barrels can be used if funds are limited. These accessories are generally sold at cabinet companies. 110, wardrobe rather not less, rather big not small, women remember! Hanging space should be able to put down the longest dress. 111, things such as glass or mirrors that are not easy to transport are best purchased nearby, or think of a good transportation method. 112, curtains best after the furniture home appliance all enter the market to order, in order to match the overall style of color. But before the cleaning, you can install the rails. 113, gas remodeling pipe is best done before tiling, otherwise it may damage the wall. It is best to let the gas company draw a picture or mark it on the wall because the cabinet company needs to open the hole in the cabinet according to the requirements. 114, cabinet installation time is longer, ranging from 4 to 5 hours, as many as 2 days, must be psychologically prepared. It can be checked at the time of installation whether the material used is the one you ordered (the cabinet material can be seen through the hinge hole). Clean the kitchen first before installing the cabinets. Once the cabinets are installed, those dead corners can't be cleaned. 115, furniture installation is best to look at the side, especially as the wardrobe's laminate are several hole selection, I did not watch at that time, resulting in the distance between the plates is too small, hanging clothes stretched Not open, but also adjust later. 116. Considering the pollution of formaldehyde to the environment, green plants such as spider plants can be placed in the room. The furniture doors open to emit odors, and special odor-eliminating materials can also be used to spray. 117, install gas alarm, reserve gas ignition. 118, brush wood paint time: it is best to wait for the room to finish the floor tile or wood floor and then brush. If you must brush, it is best to clean the room. In a room with no paving slabs or wooden floors, the dust in the room is very large. At this time, if you use wood lacquer, the dust will easily adhere to the surface of the wooden products that have been brushed through wood lacquer. The graded sandpaper is polished and then brushed again to solve the problem, but the brush's feel and the overall effect of brushing it out will be used to make a deduction. After the floor tiles are finished, the dust content in the air is much less than before the shop. Basically, the dust will not adhere to the surface of the wooden products after the wood paint is applied again. The reason why this is said is because Xiao Wu’s home improvement was met with such a situation. Originally, I saw the effect of brushing it before deciding to buy the Xijia Wood Coating. The feel is very smooth and it feels like my home improvement. Like a wooden door. Just because of the above situation, the result has been discounted a lot. This has always been a matter of regret for Xiao Wu. Moreover, in the process of organizing hi-lacquer group purchases, some of the same scholars appeared in this situation. So here to remind the students to pay attention. I do not know if other wood lacquer has such a situation, but according to the same principle that can be proved, so remind the students to pay attention here. 119. About replenishing paint: The painter pays to wait for the wall surface to dry again to finish the putty, the putty layer dries after the paint. If there is no reason after brushing the paint, install the lamps and various electrical switches. Ask the students to remind the teacher who installed the lamps and electrical switches to take care to clean them up before loading. It also saved a touch up process. Of course, to defile the wall, the decoration team must have asked the painter to make up for the paint again, that is, to clean the dirty wall (if it was a paint company, they would also let the teacher pay for the paint, If you pay attention to how many painters pay for a part of paint after brushing the wall, the remaining part of the paint is used to make up the paint.) Just pay attention. Don't let the designer of the lamp pay attention to the wall. You can let the painter pay less for a ride (at least half the day). We have a lot of convenience, and why not? Sometimes it is convenient and convenient for people. Generally speaking, the wood paint is brushed before the wall paint is applied. This is to prevent the wood paint from affecting the wall surface of the wall paint during the dry process. Of course, in the actual operation process, you can also paint the wood lacquer after laying the floor tiles (the floor trowel has been approved before paving the floor tiles), and then paint the wood lacquer after the wood lacquer dries out. Just do so, of course. Will affect the schedule. If you are afraid of affecting the duration of the project, you must minimize the impact of dust in the air, and you should diligently clean up the sanitation of the room. 120, the decoration team's choice: As for the choice of guerrillas or regular companies, I think it is not important, the key is to give your construction team's head is serious and responsible, the decoration of the workers' technology, of course, the quality and price of decoration. First of all, do not look for more than four decoration companies. This is true for most of them. If your time is very rich, it will be something else. Before speaking with the decoration company, it must be clear that you have to do those renovation projects, you can first ask the decoration company to report all the items, compare the price and comprehensive consideration of various factors and then you decide which items to outsource Which items to decorate the company to do. For those who decorate, the lower the better the decoration offer, of course, the decoration company's opinion is the opposite. Sometimes, in order to pull the business, the decoration company will press some of the quotes at a relatively low price. As a result, the quality of the project and the quality of the materials will be more difficult to guarantee. There are a lot of renovations. You want items to be the lowest prices. That's unrealistic. Moreover, the quotation in the decoration can not only look at the figures, but also depends on the contents inside, the materials, specifications, and brands used in this project. You know, every offer in the decoration is actually very elegant. 121, construction? Since I am not in a hurry to check in, I plan to look for casual workers: The good craftsmen invited from my neighbors' homes may be the object of my selection: a mason, a carpenter, a plumber, and a painter. Step by step design step by step, I believe that slow work out fine. 122. Every penny is spent on the edge: When looking at the decoration materials, it will certainly take a good look. There are too many good things, and it seems that every single one of them looks economically acceptable. In the short term, these things can be purchased in one place and the economic pressure is great. Often, most people become disarrayed at this time. One result is that the last budget is overspending too much, and the second is that the first thing to buy is high quality and the latter is mixed. My opinion is: First, set the price, then choose the material. Do not waste time on material items that exceed the 10% mark at the predetermined price. Businesses are always fine buyers. I am making a detailed schedule of required materials and will post it for future reference. Second, can save the province, the flower to spend. The most expensive place is carpentry, kitchen cabinets. The places where quality issues are most likely to occur are hydropower and kitchen and toilet water. 123. The cost of furniture must be higher than buying furniture. General furniture 500-700 yuan per square meter. 124. The concealment project is the most important place where money cannot be saved: such as the transformation of water circuit and waterproof treatment. The method is to ask B&Q to do it. B&Q now has a single decoration service: such as hydropower reform, materials purchased, waterway 40 yuan per meter, circuit 20 yuan per meter, half a year warranty. There are detailed individual service items and quotation announcements on the east side of B&Q's first floor. Everyone can refer to them. 125. The most worry-free way is to use online resources to collect, retain, organize, and integrate. In the future, it will surely send a big use. 126. In order to save time and improve efficiency, each time there is a harvest in the decoration materials market, a detailed and practical procurement and budget schedule is very important. The plan list is easier to implement when sorted by room type: Each time you go to the street to see things in the same room, it is easy to compare and integrate, and it is easy to be effective. First, the hall project two, the living room project three, the restaurant project four, the master bedroom project five, the children's room project six, the study project seven, the main health project eight, the guest health project nine, the kitchen project ten, the balcony project eleven, Yintai project I will now post my own sample plan for your reference. The data in the table is an example. This list is more convenient for use as a procurement plan. Before the construction, the corresponding items can be reclassified and consolidated according to type of work, and divided into mason, woodworking, hydropower, and paint, etc., to be re-tabulated. You can also add the "Construction Requirements" column to the right of the table. Such as (wall latex paint three batches of three brushes; shoe cabinet Waiye board, brush polyurethane varnish) and so on. 127, home theater rear speakers, sound wires to be buried in the living room below, this is very important! 128. Add a washbasin to the balcony and pre-install the water pipe for decoration. Balcony sink is very important, watering, washing hands and so on. 129, toilets, kitchens need background music, pre-embedded audio and audio cables. 130, on both sides of the balcony to leave the socket, when the New Year hanging lanterns, good power. Thanks to Zhao Xin's supplementary: 1: The bathroom is divided into wet and dry zone 2 floor drain on the wet area is better 2: if it is a natural gas water heater, pay attention to the toilet should have adequate ventilation settings 3-4: If you do not understand Ask a professional friend to escort the masters who are deceiving now. 11: The hydropower is still looking for professionals to help themselves because in this regard, they also have the function to inform the designers of their own life needs to carry out the transformation, but once the problems arise in the renovation and relocation, until your home is installed, the line has problems. It is a very big thing to take down the wall and do it again. 12: The waterproof of the bathroom depends on the floor tile of your choice. The professional bathroom floor tiles are made with waterproof treatment. You can rest assured at the time of purchase. But the reason why waterproof is not done well is because of design problems. To the designer, he will cut off the bricks to fill up your ground. This will destroy the original design of the waterproof tiles. Of course, such tiles can be used. You can't find out, but your house. For decades, we need a long-term guarantee, so be sure to pay attention to the design of your brick in the pavement when there is no damage 19 Now the combination of cabinets are directly ready to buy the most is because the water problem at home needs designers Close-fitting design Of course, in addition to the waterway design, you also need to know who the designer is at home and often go to the kitchen to better determine the dimensions of the cabinet so that you can use it more comfortably when cooking at home. This is a safe and reliable way to make up for this: The use of tile grout and white cement is not the same, but bricklayers usually use white cement. French tile grout to fill, so do not live in the era of sealant, caulks and a little bit better to be pointing to the wall instead of doing the paste. Also, cabinet hinges, pool drains, switches, etc. should be used well, and cabinet fabrics, sink pools, latches can be used in general, of course, if you have the money will not care. If it is not a large package, it is recommended to buy building materials as far as possible to go to Oriental homes, homes, B & Q can be returned to buy places. 131, the light switch at the entrance, the use of induction type is recommended. Go home in dark days and save it dark. 132. Basic construction description 1. Water and electricity reform (a) Before the construction team enters the construction site, the water pipe must be “pressed” tested (a “15-kilogram water pressure test for 15 minutes”). If the “pressure gauge pointer” does not change, You can rest assured that the water pipes will be changed. Otherwise, you must not use them to change the pipes. You must first notify the “management office” and let the “management office” conduct the repair and maintenance. After the “suppression” is normal, the pipes can be changed.) and the “circuit” test (Tested with a "light bulb with a socket". The "bulb" is bright.) (b) Grooving can not damage the load-bearing wall and cast-in-place part of the floor. You can remove the levitation layer and install a "box" on the load-bearing wall. ”, can not destroy the internal steel structure. (c) Before the “line pipe” is buried, the term “terminus prevention” must be handled for the “slot”, and the “line pipe” and the “line pipe” must be connected by “direct” or “elbow”. The "cup comb" needs to be installed at the junction with the "bottom box", and all wall and ground circuits must be at an angle of 90 degrees. If the original line needs to be changed and it is not possible to use the "direct" or "elbow" connection, it must be connected with the "Huang Laguan" and the "Huang Laguan" should not be less than 10 cm into the line pipe at both ends. (d) The "3 branch line pipe" is the best way for the circuit to be buried in the wall, and "4 point line pipe" for the ceiling line. The "wires" in the "wire line" must not have "connectors", and the "connectors" must be found in another "line box", and the "pipeline internal wires" must not exceed the "pipe diameter" of the 60 percent mark. (e) "Red" is required for strong "Firewire", "black" is used for "zero line", and "yellow" or "blue-yellow separation line" is used for "ground line"; "four-core" is required for "telephone line". "Phone line"; "network cable", "audio cable" and "TV line" need to be selected according to actual conditions. (f) After the “water and circuit” transformation is completed, the waterway shall be pressure tested again. After the pressure is normal, cement mortar shall be used to seal the tank. 133. Waterproofing (a) When the kitchen and toilet “water and electricity transformation” are completed and sealed, the next step “waterproof” can be performed. (b) "Waterproofing" According to different materials, there are different construction methods. Now "Shanghai Huili 911" is taken as an example: Bathroom waterproofing is the best, kitchen waterproofing is generally 1 meter high, and the floor is waterproof and away from the wall. 30 centimeters to do two times, 30 centimeters or more to do it again, the door cover waterproofing needs to be wrapped around the door. (c) After the water-proof finishes, it will be tested for 48 hours. After 48 hours, it will go to the next floor to see. If there is no wet mark on the ceiling, it can be passed. Otherwise, water must be redone. Floor. The most likely leak is the “floor drain”. 134. Tiles (a) Owners need to determine the quality of the tiles when choosing ceramic tiles. The method is: firstly, see if its color is uniform, without variegated color and small black holes; secondly, see if its size is the standard, Use a tape measure to measure the length and width of the tile. The measured size must be the same as the factory size of the logo. Then measure the diagonal of the tile. If the diagonal dimensions are the same, the tile is positive; then the flatness of the tile is the most important. The simple and effective method is to overlap the two tiles of the same brand positively and negatively. If there are obvious gaps between the two tiles after overlapping, or if they can rotate, the tiles are not flat; finally, there is no color difference between the tiles. The method is to take out several pieces of the same. Samples of type tiles are compared at bright places and, if they do not show any difference in color, they can be ordered. (b) After the tiles are attached, there must be no emptying of the whole tile (local hollowing can not exceed 20 percent of the entire tile). If there is a hollow tile for rework, normally under normal circumstances, each tile is 100. Tiles and wall tiles allow 1 tile to be empty. Floor tiles allow 2 tiles to be hollowed but must be reworked. Rework of the main material (which is already included in the loss) is the responsibility of the owner, if it exceeds this range. , the main material is responsible for the construction party. (c) Under normal circumstances, the levelness of the floor tiles is allowed to have an error of 2mm, the gaps of the floor tiles must be the same, the corners of the bricks and bricks should be flat (allowable to have an error of 0.5mm), and the bricks and bricks of the kitchen and bathroom wall tiles Where the diagonal corners are to be leveled, horizontality (allowing 1mm error) and verticality (allowing 2mm error) must be achieved. For toilets and balcony floor tiles, leakage must be considered. The slope must be put first, if there is no special reason There is stagnant water. (d) After the wall tiles and floor tiles have been laid out, the “seam sealant” or “white cement” shall be used for caulking. 135. Termite prevention (a) Perform a comprehensive termite prevention (ie, termite spraying in the whole house) after the wall and trunk wastes have been cleaned up. (b) Termite treatment is required after the arrival of all plates. Termite Termite Protection (c) Before applying wood flooring, it is necessary to do a termite-proof treatment on the floor where the wood flooring is to be applied (d) Termite spray is better to spray wet (it can be seen clearly wet) 136, Calculator is also available Researchers, nowadays calculators have the function of setting decimal multiples, there will be different standards in the calculation, so we need to bring a calculator, now there are calculations on the phone, but the function is not necessarily it is good. 137, prepare two good neutral glass plastic (1 transparent, 1 white), recommended by the United States General Corporation, B & Q sold, 49. It is used when installing bath rooms, washbasins, cabinets, and security doors. Although the general manufacturers package will come with glass glue, but most of the glass glue they provide is of poor quality and will be susceptible to discoloration or mildew in the future. 138. If it is not a last resort, do not use a shifter in the toilet. This stuff is very likely to cause plugging of toilet seats. 139, the kitchen of the aluminum gussets, hood above the two, after opening a good hole must be fully installed after the hood is installed. My family settled in early, and later when the hood was removed and dismantled, the workers were transformed and the seamless ceiling became a seamed ceiling. 140. If the kitchen and the bathroom are also equipped with wooden doors for the sake of uniform appearance, glass glue shall be put on the joints between the door frame and the ground immediately after installation. My family did not handle it in a timely manner. Workers were careful not to use water. A lot of water splashed on the floor and leaked into the door frame. The following section was a bit dark (mildew). 141. The balcony must be tiled! The corner of the balcony will be paved in a circle, and the living balcony will be paved to the same height as the railing. My house view balcony corner and the living balcony wall without paving, had to prepare a bucket of paint, they regularly refreshed ... 142, in the hydropower reform before the closure of the wall must let the master of the decoration to provide detailed hydropower diagram. 143. If you are ready to paint a wall in color, you must consider the problem of changing lines when remodeling electricity. My home has changed a lot of lines and the air-conditioning socket has been completely changed. However, in order to save money, there is no change in the entire line but wiring. Wherever wiring is required, the white board must be installed for future inspection. When I finished brushing the color wall paint, I discovered how dazzling these whiteboards were, and I was sorry to say that this is the lowest level error I made. I take it for granted that the bed width of 1.5 meters is 1.5 meters and I forget the bedside. There is also thickness. The lamp socket was also accurately placed on the wall behind the nightstand. As a result, the socket is blocked and there is no way to use it. 145. Before the start of construction, let the decoration captain analyze how the wall is treated and whether it is necessary to scrape the original powder. In particular, students who are outsourcing wall projects to paint companies are prepared. My home is for the paint company. After the carpenters finish the paintwork, they only know that the original wall is really poor. It is best to remove the ash. However, because the carpenters have already done it, it is not easy to get rid of the original ash. Finally, I had to brush a layer of 108 glue on the surface for batch ash. 146, increase the line must be re-wiring. However, you can wire from the nearest terminal branch. It is not allowed to add connector wire to the original wire. 147, air conditioning control switch can only be at the power supply side. It is not allowed on the line. 148. When changing the position of telephone and network cable, you can use the original cloth line to continue to use it. However, there are many hidden dangers if construction is improper. So it is best to change the line from the weak box in the room. 149, measuring the amount of work to transform the circuit, generally in accordance with the three different wiring methods to measure separately. (1) Grooved pipe (measured by the length of the slot, if there is more than one pipe in one slot, it is calculated as half of the number of pipes. The other half is included in the overhead line). (2) Overhead line (only pipe not grooved), calculated according to the length of the pipe. (3) Change the line, even if the number is replaced (the line that was replaced tells the construction team to throw it). (4) Weak electricity transformation, calculated according to the first method. The difference is to pay attention to who bought the weak wires. Owners will deduct the price of the wire when they buy it. 150, how to fix the toilet on the ground, use screws? There is also a connection between the base and the pipe. It is better to use a seal between the inside and the outside. The toilet is fixed with expansion screws. The joint between the base and the pipe is filled with a toilet sealant. Outside with white cement + white glue deployment of cement paste. When buying a toilet, it is generally equipped with a special sealant. 151, to buy materials must first calculate their approximate consumption. When thinking about buying waterway materials, I thought that after finishing the painting process, the materials used in the latter painting would come out. Then I trusted the foreman for a moment. As a result, I discovered that the pipes were bought for 5 meters, and the copper head actually used 27 pieces. , actually bought 40, there should be 13 remaining, the actual remaining 7 shorts 6. After repeated enquiries, the foreman has recovered six copper heads from other construction sites that he had accidentally mixed. The circuit itself calculated the material in advance, and the calculated results were compared with those of the foreman: the wire was changed from 30 meters to 12 meters, the cable was changed from 20 meters to 13 meters, and others such as insulating tapes and plugs were greatly affected. The bedding is corrected ... 152. If there are old sewage pipes on the ground, they will often be damaged when the ground is removed. Don't hesitate to lay new ones. Do not save them for safety reasons. 153. The invagination space on the bathroom wall should not be abandoned. It is very nice to paste tiles. Of course, the watts union felt that it was time to say "ugly" and "not popular now". Oh, don't be fooled. He wants to be lazy. 154, tile Yang angle do not use the edge line, to tiler grinding 45 degree angle mosaic is beautiful, you do not mention the bricklayer of course choose to do something lazy way. 155. When aluminum-plastic pipes are installed to seal cement, they must supervise workers to reserve expansion space for hot water pipes in accordance with construction standards. In short, the aluminum-plastic pipes should not be firmly sealed, but some loose. 156. If the bathroom floor is higher than the hall, you can use the door stone to solve the transition. 157. If you add a pipe to the sewer, you should check whether the old sewer is open before docking at the entrance of the new pipeline and the old sewer. It is time to spend a lot to clear up a lot of trouble in the future. 158, aluminum buckle board does not have to buy high prices, very cheap aluminum buckle board has far better than the effect of PVC, and spend more money can not see the significantly different results. 159, buy aluminum buckle board should pay particular attention to the keel instead of the aluminum buckle board itself (the goal of the aluminum buckle board is not easy to do the hands and feet), the keel will always be finished ghost. 160, the color of the floor tiles is difficult to find satisfactory, I did not find, but two kinds of dissatisfied colors intertwined and then turn a 45-degree angle can reach my very satisfied results. This good idea was actually suggested by the bricklayer. 161. Floor waterproofing agent should be used under supervision. My bricklayer is not splashed directly on the ground according to the requirements. Can it be uniform? It is not the best way to do it yourself. 162. The slope of the bathroom floor should be considered well before paving. According to the national standard, the slope cannot achieve the effect of rapid drainage, and if you use a deodorant floor drain or an ultra-thin floor drain, it will greatly increase the difficulty of drainage. Some people say that the slope is not beautiful, I think it is nonsense. On the contrary, the fact that large slope water can be quickly cleaned is a very pleasant thing. 163. The LG Platinum Fireproof Panel used in the cabinet door works well, but if it is re-decorated, it may consider customizing the finished door panel. The door made by hand is not exquisite and is for reference only. 164. The brand price of the sink market is not cheap, and the quality of the brand is mad. 165, the balcony door is best to use the same type of fire board. The balcony environment is rather harsh. 166. To make a bathroom basin cabinet, first consider the size of the basin so that it cannot be installed in the future. 167, glass is a very heavy thing, it is best to buy in the vicinity, or think of a good transport method. 168, install the door lock to pay attention to the lock tongue on some wax, crashed and then on the wax later. If there is no door stopper, be careful to prevent the handle from damaging the wall. 169, matt paint is more beautiful than the high light, do not listen to the painter, if the painter said that the matte brush is not bad it must be its technology. Similarly, if the painter says that polyester does not have good polyurethane, but also deceive you 170, insulating tape and raw material tape are not bought in the store, the quality of the big supermarket is obviously much better, and the weight is enough, and the price is not expensive. 171. If the refurnishing will use finished putty instead of talcum powder, there is no big reason to feel that the finished putty is easy to use. Especially after digging the painter to diy himself, he realized that he was tired of talcum powder. 172. The installation of the junction box for installing the leakage protector and the air switch can not be saved, and it should not be placed outdoors on the outside. It was originally thought that the provincial payroll will be used on the old distribution box outside the door, and the electrician is advised to change it indoors. The new one now finds his suggestion very valuable. It's not hard to see behind the interior door, it's really easy to use! 173. It may be more appropriate for workers directly on the construction company's construction site to clean up the work, and the technology is better. Tools are more advanced. 174, leakage protector and air switch to use the brand name. Used "Merlin Gerin". It is also simple to buy genuine goods. Call the phone number of the headquarters of Merlin Gerin directly and then call the local branch number. 175. Under counter basin is more beautiful than the above-mentioned basin. It looks good and cleans. 176, with the basin mixer should pay attention to, taking into account the thickness of the basin, the leading mouth to be longer. 177. The hole before the toilet is installed is large. The floor drain cover can fall. If your floor drain has been installed and the toilet is not installed, be careful to cover the floor drain, or close the floor drain cover and store it elsewhere. 178. If you buy silica gel, GE imported the absolute best, followed by GE in Shanghai. Of course, if it is used in a place that is not very important, it can be used for 7 or 8 yuan. For example, inside an aluminum alloy window frame, it is blocked with garbage-grade silicone. However, GE's silicones are all used in the bathroom and kitchen. 179, triangle valve should not be omitted, but also can not save much money, if there is a triangle valve, then install the triangle valve can be found in advance whether there is leakage of copper joints, if not installed, then only the last installation of the faucet to the copper joint on the pipe Only when it was possible to check whether the internal connections installed at that time were leaking, it would be impossible to test the leakage due to leaks for a certain period of time. In the end, it would be unsafe to install internal connections and taps. 180. Even the diary has already talked about the renovations to do those things. If you can do it yourself, you can't do it, you have to use an idea. The decoration company communicates with the designer. The construction team communicates with the workers because It depends on them to realize your ideas. 181. The biggest problem with decoration is communication! 182, not much, kitchen cabinets designed into the door type, BH. Should be designed as L type. 183. In general decoration, excluding the formal decoration company's management fees, taxes, materials, etc. accounted for 75-80 percent, and wages accounted for 20-25 percent. 184, on the ground outside the kitchen and toilet, is to set a time for their own BoB!!!, who can say clearly when you give yourself trouble. 185. If you wear pipes separately, but in a tank, what is the impact? Impact can be tolerated 186, ask what is the best deal between the restaurant and the living room to separate the package door cover, only 6 cm on the side, or with white oil, 2 meters high, it does not appear large and thick. 187. Strong and weak electricity should be separately managed. It is best to separate them and keep them at a distance of 10 cm or more. However, it can not be done easily because most households open a slot for cost savings. The audio cable can be threaded into the same tube of weak electricity. 188. The inner surface of the furniture can be painted and affixed. After the opening, the doors and doors and windows in the home can be ventilated, leaving only a pungent odor. In fact, you use a good wood core board, the interior of the furniture can not be processed. 189, cabinets available 15 PCT board and wood core board, the back can be used five clips, five percent. The door and the drawer must use nine percent. Different process materials are not the same. 190. PPR pipe is not only suitable for cold water pipes, but also for hot water pipes and even pure drinking water pipes. The interface of the PPR pipe adopts hot-melt technology and the pipes are completely integrated. Therefore, once the pressure test is installed, no leakage will occur. And the PPR tube will not foul. The PPR pipe is said to never foul, never rust, never leak, green advanced water supply materials. 191. The lacquer board is good and combines the advantages of solid wood and composite. 192. Don't put wet prints on artificial stone for a long time unless you want to dry a printing table; do not put wet chopping boards on the table for a long time. Wet wood sometimes fades; wiping with a steel wire ball is like squeezing acne by hand. 193. Can a gas meter be enclosed in a cupboard with an ordinary door? Need to use blinds type doors? Open the inspection ventilation regularly. 194, tx of the contractor Please note that you must verify the list of materials that the decoration team gave you. I might be sure to estimate it. I trust them too much. As a result, I almost doubled the number of wires and tubes bought. 195. The size of the sanitary ware must be planned. It is best to draw a sketch in advance and calculate the size. 196, buy a finished product door students pay attention to, if you want to pursue the effect of the use of business matching panel package door cover, then you may be slaughtered it! 197, Re: Is it necessary to buy a faucet, basin, and sink before installing the water pipe? No, as long as you determine what is the basin faucet, bathtub faucet, washing machine faucet or something on the line, 99% of the leading and falling water are in line with international norms, as long as the workers are not careless, nothing. If you do your own washbasin cabinet, washbasin needs to be bought in advance, or look good size. The size of the sink is determined in front of the weighing platform. It is advisable to buy it in front of the loading platform. Don't forget to take it off the stage or on the stage. The distance between hot and cold water pipes must be accurate 15 cm before being sealed with cement tiles, and must be parallel. If you have already bought it, it is best to install it, and then remove it after it is sealed. 198. If you use an 8-core cable to take the phone and the network at the same time, will it interfere with each other? will not. 1,2,3,6 playing on the cable module, 4,5 playing on the phone module, the other two random. Well my experience: 10M with 1236 100M will have to use the actual 10/100M speed We don't feel any difference. If we use an 8-pin line, some program-controlled switch signals will cause interference to the network signal, and there is usually no problem in the home environment. Rest assured that it can be so wiring but I still recommend to leave some allowance for the future, the cable is very cheap, you say? 199. Be sure to check the installation of the distribution box. 200. The teachings of the faucet The pipes connected to the bathtub and the shower faucet were embedded in the wall. I have repeatedly asked them to make measurements. Do not install it when it is not ready. As a result, the distance between hot and cold water pipes was 15 centimeters, and the hot and cold water pipes could not be parallel. As a result, the plumbers spent their milk feeding power. Yesterday I discovered that the coating of my fb GROHE thermostatic faucet was cracked. If you can install the faucet first, you must first install it. Should be the first to buy back the faucet, then install hot and cold water pipes, tiling it. The puppet family bought it back very early and was bought by the master chef.

Three trees paint entrance decoration paint cement door price socket switch living room wall color living room lamp kitchen door plaster ceiling price decoration decoration company look good decoration living room decoration partition decoration style marble table cloth sofa cushion home cabinet white furniture floor tile fabric sofa room Doors Doors Stainless steel Towel racks Glass dining tables Kitchen glass sliding doors Sofa beds Sofas Sofa cupboards Doors cabinets Doors Glass tables Screen cabinets Blinds Marble Cabinets Kitchen wall tiles Glass doors Function sofas Glass bricks Blinds Cabinets Marble Tiles Floor tiles Craft glass Black floor cabinets 100 Leaf door fabric bed glass furniture counter kitchen ceiling glass counter mirror lamp stainless steel cabinet glass

Steel Composite Panel

Steel Composite Panel,Aluminum Composite Panel,Sandwich Panel,Prefabricated Building

Fireproof ACP,High Gloss ACP Co., Lt d. , http://www.nbcompositepanel.com